Loading...
Vista Ridge 1R-8 D-LR051031 E.G .EE. .G & TEST .G, ,.r,. Serving The Gee-Industry Since 1974 ,~ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 Geotech~cal CLIENT: =ROJECT: CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT JBP, LP 5301 Village Creek Drive, Suite A Piano, TX 75093 The Plaza Infrastructure Highway 121 & Ridgemont Lewisville & Coppell, TX ~.TTN: Neal Heckel iE&T TECHNICIAN: Brian Taylor )CATION OF PLACEMENT: Inlet Throats- Plaza Blvd. @ Sta # 11+50, 6+50 & 3+80 STANDARD 6" X 12" AREA 28.27 SQ. IN. REPORT DATE: 10/31/05 SAMPLE DATE: 9/16/05 PROJECT NO.: 308TXlK5 REPORT NO.: 29 PAGE1OFt Ardved: 2:30 PM Left: 3:30 PM 4 92 Air Content: 1.3 Total No. of Test Cylinders Made: 4 Total Cubic Yards Placed: 10 Added Water: N/A ;onditions: Warm & Partly Cloudy 90 of Fresh Concrete: 144 LMC 3201353 Truck #: 1049 Time Batched: 1:57 PM Time Sampled: 2:35 PM Product Code: 1851 Cement: N/A Fly Ash: N/A Coarse Aggregate: N/A Water: N/A Air Content: N/A lA 7 9/23/05 149 1 B 14 9/30/05 149 1C 28 10/28/05 149 1D 28 10/28/05 149 Curing ASTM C-31 C-143 Remarks: 111,000 125,000 132,000 & 231 Tested concrete meets/exceeds required strength. 3890 Sin~lle Shear 4200/28 3925 : Shear 4200/28 4220 4200/28 4668 le Shear 4200/28 By: Cylinders Tested By: SE&T Very Truly Yours, Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E. :ivil & Environmental Engineer istration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report ; applies to the samples tested and does not necessarily represent identical or similar samples. G:120051308txik51CpistrlCpistr291BE SAM ENGiNEERiNG & TESTING, L.P. Serving The Geo-lndustry Since 1974 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: PROJECT: JBP, LP 5301 Village Creek Drive, Suite A Piano, TX 75093 The Plaza Infrastructure Highway 121 & Ridgemont Lewisville & Coppell, TX ATTN: Neal Heckel SE&T TECHNICIAN: Danny Speaks LOCATION OF PLACEMENT: ' 121 Turnlane- 800' Time Arrived: 6:00 AM Left: 12:30 PM Slump (Inches): 4 Concrete Temperature (F): 58 % Air Content: N/A STANDARD 6" X 12" AREA 28.27 SQ. IN. REPORT DATE: 10/31/05 ;AMPLE DATE: 9/30/05 ~ROJECT NO.: 308TXlK5 REPORT NO.: 33 Total No. of Test Cylinders Made: 8 Total Cubic Yards Placed: 180 Added Water: N/A Weather Conditions: Overcast & Warm Air Temperature (F): 64 ' Fresh Concrete: N/A OF 2 Concrete Supplier: Beall Ticket #: 13649693 Truck #: 110 Time Batched: 5:29 AM Time Sampled: 6:40 AM Product Code: 340L504 Cement: N/A FI), Ash: N/A Coarse Aggregate: N/A Water: N/A % Air Content: N/A 1A 7 10/7/05 150 119,000 4208 lB 14 10/14/05 149 126,000 4456 lC 28 10/28/05 149 130,000 4597 1D 28 10/28/05 149 132,000 4668 Cudng ASTM C-31 Test Method Cylinder Made By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Shear Remarks: Tested concrete meets/exceeds required strength. Very Truly Yours, Sadik (SAM) AI-Musawe, MSc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior written consent. This report only/applies to the samples tested and does not necessarily represent identical or similar samples. G:120051308txik51CpistrlCpistr331BE S^M E.G .EER .G & TEST .G, '... Serving The Geo-lndustry Since 1974 1115 Luke Street, Suite 1OO Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790-0967 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST CLIENT: JBP, LP 5301 Village Creek Drive, Suite A Piano, TX 75093 ~ROJECT: ~,TTN: The Plaza Infrastructure Highway 121 & Ridgemont Lewisville & Coppell, TX Neal Heckel REPORT STANDARD 6" X 12" AREA 28.27 SQ. IN. REPORT DATE: 10131/05 SAMPLE DATE: 9/30/05 PROJECT NO.: 308TXlK5 REPORT NO.: 33 Time Arrived: 'ime Left: Slump (Inches): Concrete Temperature (F): % Air Content: 6:00 AM 12:30 PM 3oncrete supplier: Beall Ticket #: 89047824 74 4 Truck #: 107 Time Batched: 11:05 AM N/A. Total No. of Test Cylinders Made: 8 Total Cubic Yards Placed: 180 Added Water: N/A Weather Conditions: Overcast & Warm 80 ;oncrete: N/A 10/7/05 Air Temperature (F): 2^ 7 2B 14 2C 28 2D 28 142 86,000 Time Sampled: 12:00 PM Product Code: 340L1504 ;ement: N/A Curing ASTM C-31 Fly Ash: N/A Coarse A~gregate: N/A Water: N/A % Air Content: N/A 3041 10/14/05 141 120,000 4244 10/28/05 143 125,000 4420 10/28/05 143 128,000 4527 Test Method Cylinder Made By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Sin~lle Shear Single Shear Single Shear Single Shear 4000/28 4000~28 4000/28 4000/28 CylindemTestedOy: SE&T Remarks: Tested concrete meets/exceeds required strength. Very Truly Yours, Sadik (SAM)AI-Musawe, M.Sc., Ph.D., P.E. Civil & Environmental Engineer Texas Registration Number: 61893 This report is for the sole use of the client addressed. The use of our company name must receive our prior wdtten consent. This report only applies to the samples tested and does not necessarily represent identical or similar samples. G:120051308txikSICpistrlCpistr331BE