Loading...
Vista Point II 3-7-CS051102 T H E: C I T y 0 F C-O?PELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To' From: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Larry Davis, Construction Inspector ~D Office Phone: (972) 304-3684 ~'3~ Fax: (972) 304-3570 Date: November 2, 2005 WALK-THRU for Vista Point II Lots 3 - 7 A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for Wednesday, November 9, 2005 at 2:00 p.m. Please let me know if I can be of further assistance. cc: Paul w/Scott & Reid Fax# 469-374-0060 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"