Vista Point II 3-7-CS051102 T H E: C I T y 0 F
C-O?PELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To'
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector ~D
Office Phone: (972) 304-3684 ~'3~
Fax: (972) 304-3570
Date:
November 2, 2005
WALK-THRU for Vista Point II Lots 3 - 7
A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled
for Wednesday, November 9, 2005 at 2:00 p.m.
Please let me know if I can be of further assistance.
cc: Paul w/Scott & Reid Fax# 469-374-0060
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"