Loading...
ST9905DR-EM050901 OPINION OF PROBABLE CONSTRUCTION COST PROJECT No: ST 99-05DR iBethel Road I D~ainage - Phase 'A' , DATE: September 2005 ITEM NO. DESCRIPTION OF ITEMS UNIT QUANTITY UNIT PRICE TOTAL PRICE I-1 Mobilization LS 1 50000.00 50000.00 I-2 Site Preparation LS 1 3000.00 ,, 3000.0(3 I-3 Remove and Dispose of Existin~l Headwall at Sta. 21+09 LS I 1 1000.00 -~-~ 1000.00 I-4 Box Culvert and Channel Excavation CY 5208 6.00 31248.0C I-5 Borrow and Embankment CY 582 10.00 5820.00 I-6 Subgrade Failure Repair (Type 'A' Grade 1 Flexible Base) CY 10 58.00 580.00 I-7 Cement Treated Base Backfill LF 154 30.00 4620.00 I-8 1.5' x 3' PVC Coated Gabion Structures CY 582 170.00 98940.00 I-9 3' x 3' PVC Coated Gabion Structures CY 291 170.00 49470.00 1-10 1' Gabion Mattress Structure CY 29 170.00 4930.00 I-11 3 Barrel- 5' x 10' Multiple Box Culvert LF 153.55 1200.00 184260.00 1-12 4 Barrel- 5' x 10' Multiple Box Culvert LF 70 1600.00 112000.00 1-13 Non-Skewed Parallel Wing Wall at Sta. 21+73.49 EA 1 12000.00 12000.00 1-14 Restore Disturbed Area LS 1 3000.00 3000.00 1-15 Relocate and Lower Existing 8" Water Line LS 1 12000.00 12000.00 1-16 Transition to Existing Box Culvert Under Bethel Road LS 1 1000.00 1000.00 1-17 Traffic Control Plan LS 1 1000.00 1000.00 1-18 Erosion Control Plan LS 1 3000.00 3000.00 1-19 Trench Safety System LF 225 8.00 1800.00 , TOTAL: