ST9302-CS 990405Z COPPELL, TEXAS 75019 Robert Weber, Project Engineer Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Sandy Lake Road Project # ST 93-02 Change Order #1 for 16" Water Line & Gate Valves Dear Mr. Weber: DATE For some time now the City of Copper has requested a breakdown ¢ pricing associated with the installation of gate valves and the extension comer of Sandy Lake and Moore Road. This letter is written as a req information requested concerning that proposed change order so that the work can take place. Each year between May 15 and September 15, the City of Coppell goes on a water conservation plan. Because of that plan and the need to provide water, the 16" water line cannot be taken out of service between the timeframe of May 15 through September 15. The 16" water line is a critical link in our water operation system. This could impact your scheduling and work operation on the project since the 16" water line has to be lowered prior to construction on the north side paving. I'am requesting that a breakdown of the proposed change order items be provided immediately and that all work associated with the lowering of the 16" water line be completed during the month of April 1999. This will allow approximately the first 2 weeks of May to perform any necessary testing to insure the water quality before the line is placed back into service. Because of the critical nature of the water supply within the City of Coppell there can be no exceptions to taking the 16" water line out of service between the timeframe of May 15 and September 15. Thank you for your consideration of this matter. If you should have any questions please feel free to contact me. Sincerely, Kenneth M . Director of Engineering/Public Works L Lee Alliaon, glmley Horn s~ l'~Uips, la.Vector file/ST93-02/belF405991tr P.O. Box 478 Coppelt, Texas 75019 972-462-0022 April 5, 1999 Robert Weber, Project Engineer Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Sandy Lake Road Project # ST 93-02 Change Order #1 for 16" Water Line & Gate Valves Dear Mr. Weber: For some time now the City of Coppell has requested a breakdown of a change order concerning the pricing associated with the installation of gate valves and the extension of water service at the southeast' comer of Sandy Lake and Moore Road. This letter is written as a request to expeditiously provide the information requested concerning that proposed change order so that the work can take place. Each year between May 15 and September 15, the City of Coppell goes on a water conservation plan. Because of that plan and the need to provide water, the 16" water line cannot be taken out of service between the timeframe of May 15 through September 15. The 16" water line is a critical link in our water operation system. This could impact your scheduling and work operation on the project since the 16" water line has to be lowered prior to construction on the north side paving. I am requesting that a breakdown of the proposed change order items be provided immediately and that all work associated with the lowering of the 16" water line be completed during the month of April 1999. This will allow approximately the first 2 weeks of May to perform any necessary testing to insure the water quality before the line is placed back into service. Because of the critical nature of the water supply within the City of Coppell there can be no exceptions to talcing the 16" water line out of service between the timeframe of May 15 and September 15. Thank you for your consideration of this matter. If you should have any questions please feel free to contact me. Sincerely, Director of Engineering/Public Works Lee Allison, Kimley Horn S~an phillips, Inspector