Loading...
WA9701-CS051103COFPELL DENTON TAP ROAD 16-INCH WATER LINE WA 97-01 PRECONSTRUCTION MEETING November 3, 2005 ~ 10:00 a.m. Na~e Company/Entity Telephone No. 13. 14. 15. 16. 17. 18. COPPELL DENTON TAP ROAD 16-INCH WATER LINE WA 97-01 PRECONSTRUCTION MEETING November 3, 2005 ~ 10:00 a.m. 1. Franchised Utilities a. Atmos Gas - 3" and 10" Lines b. Comcast c. Explorer Gas - 6" and 12" Lines (within DART right-of-way) d. TXU Electric c. Qwest Communications f, Unknown l" Galvanized Linc Prior to Construction a. Video, photograph, written notes of existing site conditions b. Measure removal items c. Verify utility locations City of Coppell Guidelines a. Working hours Extra hours b. Noise ordinance c. Changes to plans or specifications d. Keep set of Construction Standards on site e. Sanitary facilities f. Responsible party on site g. Water Utilities Department · all water must be metered · operation of water valves h. Street Department Telephone No. 972-462-5150 · traffic signal pull boxes and conduit in median i. Contractor meetings · meeting day, time, & location Telephone No. 972-462-5155 Proiect Specific Items a. Traffic Control Plan · will be working within median on Denton Tap Road · public safety will be of the utmost concern during the entire construction process · lane closures, advance warning, speed limit b. DART Agreement with Contractor c. Temporary construction easements · First Baptist Church - livestock on property · Davis Credit Shelter Trust d. Sub-Contractors · boring contractor e. Protection of business establishments and private property · repair or replacement of damaged private or public property shall take place in a timely manner. · water service disconnection and reconnection · notification of construction (Dickey's, Dairy Queen, Mercantile etc.) On-going construction - Lot 2R, Block 2, Park West Commerce Center Abandonment of existing 8-inch water line Damage to irrigation systems & resulting damage to plant life Loading of new line, bacterial tests, flushing Final cleanup and reestablishment of vegetat!on shall take place in a timely manner. Materials storage Project signs f. g. h. i. j. k. I. Submittals. a. Responsible person - Name and 24 hour number b. List of subcontractors with contact person and phone number c. Monthly estimate form d. Traffic Control Plan e. Job Specific Trench Safety Plan f. Construction sequence chart g. Materials · water pipe · fire hydrants · valves 6. Testing a. Water · hydrostatic, 150 psi for 3 hours · bacteria test, per 1000' Trench Backfill · horizontal lifts, test maximum 1' vertical and 150' horizontal with minimum 25' stagger · around structures · no testing on ramps · 95% standard at optimum to +4% moisture 7. Contract Time / Liquidated Damages 150 Calendar Days / $240.00 per day 8. Other Items