Loading...
WA9701-AG051011AGENDA REQUEST FORM COFPELL DEPT: Engineering DATE: October 11, 2005 ITEM #: 18 -ITEM CAPTION: as provided for in CIP funds; and authorizing the City Manager to sign. Consider approval of awarding Bid/Contract # Q-0805-02 to J.T. Dersner, Inc. for the construction of the Belt Line Road/Denton Tap Road 16-Inch Water Line (Airline Drive to Bethel Road) project, in an amount of $791,659.50, APPROVED BY CITY COUNCIL ABOVE DATE IIII GOAL(S): ~ __ lMotion to Approve and authorize the City Engineer & City Manager to negotiate for an early completion bonus M - York S - Suhy vote-,-o ii,V EXECUTIVE SUMMARY: Approval of this project will allow the replacement of an undersized water line with a new 16-inch water line. Our consultant on this project, Birkhoff, Hendricks & Conway reviewed the references and recommends the award of the contract to the low bidder, J.T. Dersner, Inc., of Arlington, Texas. Therefore, staff recommends award of the contract to the low bidder, J.T. Dersner, Inc., in an amount of $791,659.50 to be completed in a timeframe of 150 calendar days. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds are available in the Water/Sewer CIP accounts and from the annual payment by the CRDC on the loan from the Water/Sewer Fund. Agenda Request Form - Revised 09/04 Document Name: #Denton Tap 16-Inch WL TO: FROM: DATE: REF: T H E . C I T Y · 0 F COPFELL MEMORANDUM Mayor and City Council Kenneth M. Griffin, P.E., Director of Engineering and Public Works October 11, 2005 Consider approval of awarding Bid/Contract # Q-0805-02 to J.T. Dersner, Inc. for the construction of the Belt Line Road / Denton Tap Road 16-Inch Water Line (Airline Drive to Bethel Road) project, in an amount of $791,659.50, as provided for in CIP funds; and authorizing the City Manager to sign. On September 8, 2005, six bids were received and opened for the construction of a new 16" water line in Belt Line Road / Denton Tap Road (from Airline Drive to Bethel Road). The bids ranged from $791,659.50 to $1,201,078. The days bid on the project ranged from 120 to 240 calendar days. The low bidder on the project, J.T. Dersner, Inc., is a relatively new firm. Therefore, our consultant for the project, Birkhoff, Hendricks and Conway performed a detailed background and financial check. The owners of J.T. Dersner, Inc. and the proposed project superintendent for this project all have extensive work history with other firms on projects similar in nature to this project. Most of the projects that the firm has completed in its two years of existence have been as a utility subcontractor for other general contractors. The project consists of the removal of an existing 8" water line and the construction of a new 16" water line. The need for the new 16" water line was identified on the 1991, 1994 and 2005 Water Master Plan. Based on the experience of the principals and project superintendent, their work as a subcontractor on other projects, and their financial resources, Birkhoff, Hendricks and Conway has recommended that the City of Coppell award the project to J.T. Dersner, Inc. Therefore, staff recommends approval of the contract to J.T. Dersner, Inc. in the amount of $791,659.50 for the construction of the Belt Line Road / Denton Tap Road 16" water line, with 150 Calendar Days for construction. Staffwill be available to answer any questions at the Council meeting. CITY OF COPPELL, TEXAS Denton Tap Road 16-Inch Water Line (Airline Drive to Bethel Road) BID SUMMARY Bids Received ~ 10:00 a.m., Thursday, September 8, 2005 Contractor J. T. Dersner, Inc. 1032 W. Pioneer Pkwy., #400 Arlington, Texas 76013 Barson Utilities, Inc. 5326 W. Ledbetter Dallas, Texas 75236 Big State Excavation, Inc. 15531 Kuykendahl, #280 Houston, Texas 77090 Mike Albert, Inc. P. O. Box 211044 Bedford, Texas 76095-8044 Rodman Utilities, L.P. 6831 Ash Street Frisco, Texas 75034 Jim Bowman Construction Co., LP 1111 Summit Ave., Suite 1 Plano, Texas 75074 Total Amount Bid (Items 1 Thru 38) Tangible Personal Property Cost $ 791,659.50 $ 400,000.00 $ 798,589.90 $ 519,083.47 $ 869,207.50 $ 564,985.00 $ 913,134.50 $ 368,000.00 $ 1,052,838.00 $ 281,860.00 $ 1,201,078.00 $ 492,000.00 Calendar Days Bid 150 150 150 180 120 240 BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 RONALD V. CONI3/AY, P.E. PAUL A. CAP. LINE, P,E, DOUOLAS K. SHOWERS, P.E. Dallas, Texas 75231 Fax (214) 361-0204 October 11, 2005 Phone (214) 361-7900 J. T. De~ Inc. 2101~. Shady Grove Rd. /I~ng, Texas 75060 Re: City of Coppell, Texas Denton Tap Road 16-inch Water Line (Airline Drive to Bethel Road) Project No. WA-97-01 Bid No. Q-0805-02 Gentlemen: The City of Coppell's City Council, at their regularly scheduled meeting on October 10, 2005, accepted your proposal for the Denton Tap Road 16-Inch Water Line project and awarded you a contract in the mount of $791,659.50. We are enclosing for your execution, six (6) copies of the following documents: · Proposal and Bid Schedule · Performance Bond · Bid Affidavit · Payment Bond · Standard Form of Agreement · Maintenance Bond Upon completion, please return all copies to our office for further execution by the Owner. Also please provide a certificate of insurance in accordance with Item 1.26 - Insurance of the Supplementary Conditions. We are also enclosing one (1) set of plans and specifications for your use. If you have questions concerning any of this information, please give me a call. Sincerely yours, Enclosures cc: Mr. Kenneth M. Griffin, P.E. ~' Mr. Jerod Anderson, Purchasing Agent Ms. Suzan Taylor 1.9 acres of property located along the south side of Bethel Road, east of Freeport Pa~rkway, and authorizing the Mayor to sign. Councilmember Peters seconded the motion; the motion carried 7-0 with Mayor Pro Tern Brancheau and Councilmembers Peters, Hinojosa-Flores, Tunnell, Paught, Suhy and York voting in favor of the motion. 18. Consider approval of awarding Bid/Contract # Q-0805-02 to J.T. Dersner, Inc. for the construction of the Belt Line Road/Denton Tap Road 16-Inch Water Line IAirline Drive to Bethel Road~ project, in an amount of $791,659.50, as provided for in CIP funds; and authorizing the City Manager to sign. Presentation: Ken Griffin, Director of Engineering and Public Works, made a presentation to the Council. Action: Councilmember York moved to approve awarding Bid/Contract # Q- 0805-02 to J.T. Dersner, Inc. for the construction of the Belt Line Road/Denton Tap Road 16-Inch Water Line (Airline Drive to Bethel Road) project, in an amount of $791,659.50, as provided for in CIP funds; and ~~ Gity Manal~er to sign ~.,aet mathe~'ize the Ci~ Engineer & City -Mak,{~r 'i~ n~ ~ ~ early c°~P~e~n bonus. Councilmember Suhy seconded the motion; the motion carried 7-0 with Mayor Pro Tern Brancheau and Councilmembers Peters, Hinojosa-Flores, Tunnell, Faught, Suhy and York voting in favor of the motion. 19. Necessary action resulting from Work Session. There was no action necessary under this item. 20. City Manager's Report. A. Update on the S0th Anniversary Celebration. City Manager Jim Witt updated Council on the upcoming October 29th celebration at Andy Brown East. P~ge 10 of 11