Loading...
ST9301A-CS 951019 (2).. .'- DALLAS COUNTY PUBLIC WORX$ October 19, 1995 Mr. Lloyd James, P.E., Project Manager Charles Gojer and Associates, Inc. Consulting Engineers 11615 Forest Central Dr. $204 Dallas, Texas 75243 ~e: Sandy Lake Project 91-838 (Coppell E. City Limits to Dallas City Limit) Stor~ Sower Outfall, Proli~inary ROW Plate, Minutes froB Conference cf October 10, 1995, & Letter to Ken Griffin dated October 17, 1995 Dear Mr. James: The following attachments were picked up by your courier this date: 1. Minutes from the Sandy Lake Co-Ordination Conference held at the office of Dallas County Public Works on October 10, 1995. Please review the minutes carefully and advise Dallas County, in writing, of any topic that does not meet with yourunderstanding of the discussions. 2. A copy of a plan sheet showing a plot of tope for a possible storm sewer route that begins at the Elm Fork and ends just east of the new park access road. This is supplement to the data I provided you on October 13, 1995. You may call Mike Rapp at 653-7151 if you have questions concerning this plot. 3. Copy of a letter to Ken Griffin dated October 17, 1995, concerning his review comments of preliminary plans for the bridge project. Ail of his concerns required investigation on your part. Please give particular attention to those concerning the Harrington Bait Shop and those concerning the desire by the City of Coppell to extend bike lanes and sidewalks to McInnish Park. 4. Copy of document entitled "RIGHT OF WAY DEED AND PLAT GUIDELINE" (two pages plus two exhibits). By cover letter dated October 16, 1995, Hr. Shawn Rockenbaugh of Halff Associates provided me "Advance Copie~" of plats for the parcels at the west end of the project. These advance copies are of 'some value and we appreciate having them. However, much more information is needed before we can formally accept these documents for review. Your 411 Elm Street Dallas, Texas 75202 653-7151 Mr. Lloyd James, P.E., October 19, 1995 Page Two next submittal should indicate that the mentioned guideline has been followed. In addition, you should address the following comments: a. Parcel 27; need to show proposed driveway, bridge, and retaining wall construction, and show any slope, temporary or driveway easements. b. Parcel 28; need to existing driveway and gate at approximate right of station 66+20 (Farrow tract). Show any slope, temporary or driveway that may be needed. c. Parcel 29; need to show existing driveway and gate right of approximate station 66+20. Show any slope, temporary or driveway that is needed. d. Parcel 30; question, is existing access road on a easement from the school property? e. General all parcels; 1. Show any slope, temporary or driveway easements that may be needed. 2. All corners for areas of take, including easements must be labeled with station and off-set from centerline. 3. When will corners be set? As always, you may call me at 653-6423 if you have questions concerning the above. Sincerely, Irvin S. Griffin. ~.~., ProjeCtisg Enginee~ 8~las Camarr£11o, P.E., R.P.I',.$. Shawn Rockonbaugh, Halff