Loading...
Freeport NIP(2.5)-CS 971121The City With A Beautiful Future Pat Acker [gl'n ! ff Associates 8616 Northwest Plaza Dnllan, TX 75225 P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 21, 1997 Replat of Freeport North, Lot 1 & 2, Blod[ 2 (Northpoint Business Center) Development Fee A~sessment Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $68,415.00. and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginnin~ of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sima, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Replat of Freeport North, Lot I & 2, Block 2 (Northpoint Business Center) Date: 11/21/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $391.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,235.58 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility 'Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $49,290.00 $49,290.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development conWacts TOTAL $75,707.54 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $68,415.00 DEVELOPMENT FEE WORKSHEET PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) DATE: 11/21/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): Fireline Meter(s): 2 - 2 inch 16 ESU's I - 2 inch 8 ESU's 1 - 8 inch 2.5 ESU's I - 10 inch 0 ESU's Total #: 26.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 2 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/FireHne): Total #: 1 Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water maters) $195.98 $2,459.10 $3,580.50 Water Meter Deposit Fee (Domestic): Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewatcr Impact Fee: Total Domestic Meters ESU' 16 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $11,925.00 $300.00 $391.96 $195.98 $2,459.10 $3,580.50 $60.00 $105.00 $7,200.00 $100.00 $100.00 - Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ 8150.00 / Lot Multi-family @ 875.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 8350.00 / Lot .Multi-family @ 8350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ 81285.00 / Lot Multi-family @ 81285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 8292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A 849,290.00 Information not available at this rune Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center) 11/21/97 ROADWAY IMPACT FEE: iService Area * Category ** 4 Industrial Land Use ** General Light Industrial Building Size (Sq. Ft.) 310,000 Development Units ** 310 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $98,580.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 50 % Credit as per approval by City Manager = $49,290.00