November 21, 1997
Replat of Freeport North, Lot 1 & 2, Blod[ 2 (Northpoint Business Center)
Development Fee A~sessment
Dear Mr. Acker:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $68,415.00. and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginnin~ of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sima, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Replat of Freeport North, Lot I & 2, Block 2 (Northpoint Business Center)
Date: 11/21/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $11,925.00 $11,925.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $391.96
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $6,235.58
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility 'Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $49,290.00 $49,290.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development conWacts
TOTAL $75,707.54
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $68,415.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
DATE: 11/21/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
Fireline Meter(s):
2 - 2 inch 16 ESU's
I - 2 inch 8 ESU's
1 - 8 inch 2.5 ESU's
I - 10 inch 0 ESU's
Total #: 26.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 2 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/FireHne):
Total #: 1 Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @
Total #: 1 Fireline Meter(s) @
(100% due prior to issuance of water maters)
$195.98
$2,459.10
$3,580.50
Water Meter Deposit Fee (Domestic):
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewatcr Impact Fee:
Total Domestic Meters ESU'
16
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$11,925.00
$300.00
$391.96
$195.98
$2,459.10
$3,580.50
$60.00
$105.00
$7,200.00
$100.00
$100.00 -
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ 8150.00 / Lot
Multi-family @ 875.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ 8350.00 / Lot
.Multi-family @ 8350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ 81285.00 / Lot
Multi-family @ 81285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, 8292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
849,290.00
Information not
available at this rune
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Replat of Freeport North, Lot 1 & 2, Block 2 (Northpoint Business Center)
11/21/97
ROADWAY IMPACT FEE:
iService Area *
Category **
4
Industrial
Land Use ** General Light Industrial
Building Size (Sq. Ft.) 310,000
Development Units ** 310
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
$98,580.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
50 % Credit as per approval by City Manager =
$49,290.00