Freeport NIP(8.1)-CS010919 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Larry Davis, Construction lnnpector Engineering
Danny Hightower, Utilities Division Public Works
September 19, 2001
Walk-thru Freeport VH 611 South Royal 9/18/01
1. Reset WAD manhole and grout inside.
2. 2" FH on east side of buildin_~ is dripping.
3. 4a FH on east side of bui]dln_~ is ieakln_~.
4. Clean drainage for vault at southwest vault or raise vault door.
5. Need cap cover for Fire Department.
6. At 2'd vault mark FLV not FHV on pad.
7. Replace irrigation box to metal meter can on DC.
8. Need paperwork on 2 vaults tested DDC.
9. Repair chain on Fl[ northwest of bui]dln_~.
10. Remove dirt and flush with ground around irrigation DC at 2'~ vault.
11. 2'd FH north of building paint valve stack lid red and clan valve stack of dirt and
repair chain.
Note: For questiom or when re~dy for re-walk call 972-304-354~, Danny Hightower.
CITY OF COPpF-LL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
09/19/01 08:26
ID--CITY OF COPPELL
DATE
S,R-TIME DISTANT STATION ID
0B'25" 972 30a, 7041.
MODE PAGES RESULT
CALLING 01 ~K 0000