Loading...
ST9301A-CS 951017 (2) DALLAS COUNTY PUBLIC WORKS October 17, 1995 Mr. Ken Griffin, P.E. city Engineer City of Coppell P.O. Box 478 255 Parkway Coppell, Texas 75019 Re: Sandy Lake Project 91-838 (Coppell E. City Limits to Dallas city Limit) Letter dated October 10, 1995 Memo to Coppell City Manager dated October 5, 1995 & Conference of October 10, 1995 Dear Mr. Griffin: The purpose of this letter is threefold, first to respond to the concerns listed in your letter to Dallas County dated October 10, 1995 concerning the bridge plans, second to provide you comments relative to the issues presented in a memo to your City Manager dated October 5, 1995 and third to provide you minutes of the Agency/Consultant Co-ordination Conference of October 10, 1995. Letter dated October 10, 1995 County staff members met on October 13, 1995 to evaluate your comments. In addition, Irv Griffin of my staff met with our consultant, Charles Gojer and Associates, on the same day to evaluate the design impacts of your comments. For ease of reference we will reply to the seven (7) comments indicated in your letter as follows: 1. We had previously instructed our consultant for the project to utilize 4:1 slopes instead of the 3:1 slopes that was shown on the preliminary plans you reviewed. 2. As in Item $1, we had previously instructed the consultant to utilize 27 feet face to face paving lanes in the City of Coppell. 411 Elm Street Dallas, Texas 75202 653-7151 Ken Griffin, P.E. October 17, 1995 Page Two 3. Concerning your request to modify the pavement transitions at each end of the bridge, our consultant has been instructed to begin evaluation of your request. At first glance compliance with your request seems possible. Remaining issues (relative to bike lanes) with this request are mentioned in our comments to your memo to Coppell's City Manager dated October 5, 1995 relating to the handling of bicycle traffic on the bridge. 4. At first glance, we believe your request can be accommodated. However, our consultant has several questions prior to making plan changes. Irv Griffin will be contacting you for clarifications or questions relating to vertical clearance, width of flat area desired, guard fence, and what type of traffic, i.e., pedestrians, bicycles, maintenance vehicles, etc., you anticipate needing such access. 5. At the Carrollton end of the bridge, currently no provisions for either bike lanes or sidewalks are provided at the east end of the bridge. By letter to Tim Tumulty dated May 31, 1995 the County requested the City of Carrollton's specific desires with respect to sidewalk and bike lanes at the east end of the bridge. By letter to the County dated June 8, 1995 Tim Tumulty indicated that Carrollton did not desire that either bike lanes or sidewalk be incorporated into the County's project. 6. You are correct in stating that conversations have occurred with Mr. Harrington concerning access to his property. We are aware that Bill E. Jessup, P.E., formerly Project Engineer for Dallas County on this project, met with the property owner to discuss and work out access details. Several of the issues, such as location of retaining wall and the sidewalk that had initially been shown on the plans, mentioned in your October 10, 1995 letter had previously been addressed as you suggested and apparently without your knowledge. I have, additionally, instructed Dallas County's Project Engineers to copy you with all future documents relating to Coppell's portion of this project. Also, you mentioned the plans showing parking on the right of way. This will be revised. This is to inform you that no parking spaces on City Right of Way will be shown on the County plans without first obtaining specific written concurrence of the City of Coppell. Ken Griffin, P.E. October 17, 1995 Page Three Before leaving this topic several other items come to mind. Have you personally talked to Mr. Harrington about the access plan? If you have not, do you feel that a meeting, in the near future with Mr. Harrington would be appropriate? If so, we will make Dallas County Project Engineers and representatives from the appropriate consulting engineering firms available for the meeting. Also, if you like, a representative from Dallas County's Property Division could participate. You may call Irv Griffin at 653-6423 if you wish to arrange such a meeting. 7. This item relates to Item #3; specifically regarding striping. Again, at first glance, this seems possible. This is to advise you that we have instructed our consultant to evaluate your request for likely compliance. Memo to your City Manager dated October 5, 1995 We appreciate you providing a copy of your memo to Coppell's City Manager dated October 5, 1995 relating to the handling of bicycle traffic on the bridge. Although you did not ask for comments, we are providing the following: 1. You have indicated a desire for bicycle access all the way east to McInnish Park. This desire is somewhat different than that of the city of Carrollton. By letter to the County dated June 8, 1995 Tim Tumulty indicated that Carrollton did not desire an extension of the bicycle lane beyond the limits of the proposed bridge structure. Also, we have verbally discussed this with representatives of the City of Dallas who also did not desire bicycle lanes at this time. 2. In accordance with Dallas County policy all costs associated with the extra pavement width must be funded by the City. To date neither City, i.e., Carrollton or Dallas, has indicated a willingness to fund this extra cost. In your letter to Jim Jackson of March 30, 1995, you indicated a commitment to fund on-street-bike paths. Is the City of Coppell willing to commit to funding on-street-bike paths in another City such as Dallas, in order to accommodate access to McInnish Park? Ken Griffin, P.E. October 17, 1995 Page Four 3. The preliminary park improvement plans provided to Dallas County do not indicate that provisions have been made for bicycles either by widening the Park Access Road 3 feet or by a constructing a separate paved facility for a bicycle path. Conference of October Please make reference to the minutes of the October 10, 1995 Coordination Conference (copy attached) held at this office. This is to request that you review the entire minutes carefully and advise Dallas County, in writing, of any topic that does not meet with your understanding of the discussions. You may call Irv Griffin or Alberta Blair-Robinson at this office if you have questions concerning the above, wish to review copies of any or all of the letters mentioned in this letter, or have questions concerning any other feature of the bridge project. Sincerely, Allen Bud Beene, P. E. Director of Publi orks CC: Abel Saldana, P.E., Dallas County Project Engineer Lloyd James, P.E., Charles Gojer and Associates Tim Tumulty, P.E., City of Carrollton Selas Camarrillo, P.E., Asst. Dir. DCPW Attachments: Minutes & Sign In Sheet (5 pages) from October 10, 1995 Conference ~e:~V:(~f'~.K~