Freeport NIP(2.7)-CS030729 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
July 29, 2003
Walk-thru PSS (Freeport North Lot 2 Blk 3)
1. Utilities O.K.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
HP OfficeJet G Series G85xi Fax-History Report for
Personal Printer/Fax/Copier/Scanner
Jul 29 2003 11:32am
Date Time T. _vpe ~
Jul 29 ll:31am Sent 7041
Duration P_ag~ Result
0:21 1 OK
Result:
OK - black and white fax
Okay color - color fax
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Tot
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
July 24, 2003
Walk-thru for PSS (Freeport North Lot 2 Blk 3)
3' valve extension fh'st valve north of building.
Vault lid paint blue.
Lock latch on top of vault.
4. Paper work on DC test in vaults. Fax all DC tests to me.
Paint LID on water meter cnnn blue.
Brass plugs in DC irn'gation.
Mark DOM and IRR in blue on curb.
First fire hydrant 3 ext.
paint fire hydrant red oil point all fire hydrants.
Make mark in street for all fire hydrants in blue.
Valve extension 4' on valve at Royal.
rass plug in vault on ball valves - large.
1.~~ City fire hydrant on Royal mark on curb on Royal.
.M~ Paint manhole lid red on Gateview.
Call Danny Hightower at 972-462-5150 to check punch list.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
,.lu 1 - 29-03 09:41
CHECK ONE:
IRRIGATION
FIR KLDI f~
P.O1
BACKTLOW PREI"Elq'F/ON ASSEMRLy TEST ANI) MALN'T~HAAvCIE REPORT
P, cd,_~¢a_ Pressu~ Pnncipl~
D~ublc C"h~k Valve
TYPE OF ASSEMBLY
r- A~mospbg~c Vacuum Bre *~ker
Size ~)/~-~"
~^~ Y-n ~Pit- t4/~ ca, ~_~
Smd Number ~.,~.,'.'.'.'.'.'~
REDUCED PRESSURE PRINCIPLE .~SEMRLY PRESSURE VACI]I. IM B~R
Double ~ Vnl~e Asmably
Ti~ ~ L~ a psid psid
U~
White - Customer'~ Copy YeUow - Cit)p Copy PJltk - T~t~lds Copy
jul-2g-03 09:41
CIIlICK ONE:
IRRIGATION
t)OME{ffrlC
BACi~=LOW pR~'VENTION ASS~LY TEST AND MALNTENANC'E REPORT
P~s~uze x, ~-~um Brcak~
Al:n~os~be~: V~.uum B~k~r
REDUCED p~n~'~quRE PRINCIPLE A.SSE.M~BI.Y I p~ VA~ B~R
~uble ~ V~e ~ly
t~ ~ [ 2nd ~ ~f V~ve .~r l~ ~ V~ve
~-Clos~ ' Clo~ Ti~t ~ ~ at ~cu~ at ,, psid
Ti~t ~ L~ 0 ~id ........ ~sid I
~- psid ]
~ ~ ~ D~d net Opm
.... .....
Ti~ = psM psid
~ ~M ....
I
Wtdte - C~tomer's Copy Yellow - City Copy Pink -. Tcstee's Copy
Jul-29-03 09:41
(;flECK ONE:
UtRIGATION
DOMESTIC FIR ELIN I.: V'
BACICFLOW PRE1;'ENTION A.qSEMBLY TeST AND MA/NTKNANCE REPORT
NAM~ OF PW5:
Pws I.D. #
LOCATION OF SERWCE: t t I
/
T~¢ back'flaw prcveuaou ~s~anb~ deu~qM below bas bccn ~ted mci maimamed as rcqu~d by. TNRCC
TYPE OF A$$E]V~LY
Press'm'e V~
Atmospb~-e V,no-,~
REDUCED PRESSURE PRINCIPLE ASSEMBLY I PRESSURE VACUUM BREAKER
Double Check Valve Assembly
ls~ C'neck Zed Clteck Relief Valve .~r lnJet Ch,,el, Va/ye
[muaJ Tesx DC-CLOsed 'CLosed Tight ·/ Opened at Opened at
Tigbz Sf~ Leaked n p~id
RP- psid
MateriaLs
Used
Tcst A/~ DC-Closed Closed Ti~llt o Op~ncd al Opened at psid
Repair Tifbt C: nsid psid
White - Customer's Copy YeUow - City Copy Pink - Tester ,~ Co~y
~u~-2g-03 09:4Z P.04
ClIE(:K ONE:
IRRIGATION ............
I)0 M i,~"rl C F/R~.IdN E ,,//
TYPE OF ASSEM3L. Y
Armospl,~e Vacuum Breag. er
_Y.,-,
REDUCED PRESSURE PRINCIPLE .,kSSEMBLY { PRFSSU'RE VACUUM BRE. AJ~R
Double Check Valve Assembly
Ira,al Test
Check
DC-Clos~l
Ti~t
LCa~cd
2nd Check Valve Air Inlet ('.~eck VaJve
Closed Tight Opened at { C/r,'.,'ned a: psid
~ ......... psid
Leaked
C
Test A_~ )C-Closed
Rq~r Ti~t
_ l~id
White - Cu~tomer'.~ Coi)y ~ Yellow .- C:ity Copy Pihk - 'J'eMcr'~