Loading...
Freeport NIP(2.7)-CS030221DEVELOPMENT FEES =ROJECT NAME: iINEER: {IGINATION DATE: SENT 2/27/2003 2/27/2003 2/27/2003 2/21/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 ASSESSMENT Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irri9) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection · lSubtotal to Eng. TOTALS PSS (Freeport North, Lot 2 Block 3R) Jones & Carter 2/21/2003 ASSESSED FEE AMOUNT PAlE DATE N/A $5,180.00 $2,240.00 $5,565.00 $5,565.00 pc 3/21/2003 $6,707.00 $6,707.00 rb 4/8/2003 $700.00 $700.00 2/21/2003 $200.00 $100.00 di 5/15/2003 $50.00 $205.28 $4,390.16 $4,184.88 cl 4/23/2003 $30.00 $90.00 $60.00 di 5/15/2003 $50.00 $12,972.00 $12,972.00 $0.00 Total Fees Fees Paid Amount Owed $25,407.44 $17,316.88 $8,090.56 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. ConsL Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINATION DATE: SENT 2/27/2003 2/27~2003 2/27/2003 2D1D003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2003 2/27/2OO3 ASSESSMENT Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG Permit Overtime Inspection Water Tap inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection ~Subtotal to Eng. TOTALS PSS (Freeport North, Lot 2 Block 3R) Jones & Carter 2/21/2003 ASSESSED FEE AMOUNT PAI£ N/A $5,180.00 $2,240.00 DATE $5,565.00 $5,565.00 pc 3/21/2003 $6,707.00 $6,707.00 rb 4/8/2003 $700.00 $700.00 2/21/2003 $200.00 $200.00 di 5/15 & 6/26 $50.00 $50.00 di 6/26/2003 $205.28 $205.28 di 6/26/2003 $4,390.16 $4,390.16 cl 4/23 & 6/26 $30.00 $30.00 di 6/26/2003 $90.00 $90.00 di 5/15 & 6/26 $50.00 $50.00 di 6/26/2003 $12,972.00 $12,972.00 $0.00 Total Fees Fees Paid Amount Owed $25,407.44 $17,987.44 $7,420.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.