Loading...
First Baptist-CS031009 (2)11~07×~00S CITY OF COPPELL ENGR. DEPT, a SRU CTR MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING NO. 8@] [~01 TO: Via: Fl'om: Date: RE: Jennifer Armstrong, Finance Director Ken Griffin, P.E., Dir. of Engineering/Public Works Y'~ Teresa Turner, Graduate En gine~.~..~_'~ October 9, 2003 First Baptist Church Addition After fmlher review of the engineering department's fee assessment files, it has come lo my attention that the First Baptist Church Addition was incolTeetly assessed fees for ~ additional water meter connection. Their current building already has a 2" domestic water ~'aeter connection and they will be relocating the service line Wqh a new 2" water meter therefore, no additional impact fees are req~tired. A reimbursement total of $448000 is due for the following fees: Water Impact Fee - $2240.00 Wastewater Impact Fee - $2240.00 The church will not be required ¢.o pay the Domestic Watcr Meter Deposit Fee of $30.00. I have prepared a revised fee assessment that will not show this charge. If you have any questions of need any further infolm~ffion, please feel free to contact me to discuss. Atlachment: Receipt for payment of these fees from Building Inspections. 'ClT~ OF COPPI[LL ENGIS, EF, RING- EXCELL£NCE aY DESIGN '