First Baptist-CS030630COl'FELL
June30,2003
Craig M. Hoenes
Kimley-Horn and Associates, Inc.
12700 Park Central Drive, Suite 1800
Dallas, TX 75251
RE: First Baptist Church of Coppell Addition
Fee Assessment Letter
Dear Mr. Hoenes:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City o f Coppell in the amount of $4,814.63 and for~vard
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of'
the assessed fees that need to be paid prior to Council approval. Please note that the Texas Legislature,
under Senate Bill 243, delayed the collection of Water and Sewer lmpact Fees until the issuance of a
Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% &
4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the
scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
for~'ard to working with you on this project. If you have any questions, please contact me.
Sincerely,
Teresa M. Turner, E.I.T.
Graduate Engineer
CC:
Jennifer Am~strong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
'Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Firs! Baptist ('hurch Qf (~q~pell Addition
6/30/03
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
inch
inch
inch
Total#: 185 ESU's@$280.00ea
(Due prior to issuance of building permd)
Water Tap Inspection Fee:
Total #:
Domestic Water Meter Fee:
Total #:
3 Connections @ $50.00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Meter(s) @ $205.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Firehne Meter(s) @
(100% due prior to issuance otwater r-~eters)
$205.28
$0.00
$2,092.44
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea
(100% due prior to msuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Mater(s) @ $30.00 ea
(100% due prior to msuaace of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: i Connections @ $50.00 ea
(100% due prior to ~ssuance of building perrnit)
65280.00 ea.
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $5000 ea.
(100% due prior to issuance of building permit)
8 ESU's
8 ESU's
0 ESU's
25 ESU's
$5.18000
$15000
$205.28
$20528
$0.00
$2,092.44
$30.00
$60.00
$2,24O.OO
$50.00
$5000
$o.oo
$000
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Single-family @ $000 per lot
Multi family @ $000 per unit
(50% paid prior to Council approval of final plat)
Page i
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of.way
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$4,814.63
Information not Available
Street Sign Fees:
Assessed for signage in the City's right.of way
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
DEVELOPMENT FEE TABLE
Project: First Baptist Ch urch of Coppell Addition
Date: 6/30/03
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,180.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at issuance of Water Meter)
Water Meter Fee (Domestic) $205.28
(100% due at Issuance of Water Meter)
Water Meter Fee (irrigation/Fireline) $2,297.72
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Firelinc Meter Dcpostt $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,240.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final lnspectmn Fee $50.00
(I 00% duc at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadx~ay hnpact Fee $4,814.63 $4.814.63
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee [ntbrmation not Available
(100% due prior to Acceptance of Project)
Construction inspection Fee Information not Available
(100% due prior to Start of Construction)
FOTAL $15,077.63
TOTAL AMOUNT DUE PRIOR IO COUNCIL APPROVAL $4,814.63
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
First Baptixt £'hurch of Coppell Addition
6/30/03
ROADWAY IMPACT FEE:
Service Area * 6
Category ** Institutional
Land Use ** Church/Synagogue
Building Area (sA 30,863
Development Units ** 30.86
Vehicle Miles per Development Unit ** 0.52
Fee per Vehicle Mile *** $300
Roadway hnpact Fee due - (Development Units) x
Vehicle Miles per Developmenl Unit) x (Fee per Vehicle Mile) $4.814.63
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway hnpact Fee Study)
I 4MOUNTDUE: $4,814;63 I