Loading...
First Baptist-CS030630 (2)DEVELOPMENT FEES PROJECT NAME: First Baptist Church of Coppell Addiiton ENGINEER: Kimley-Horn ORIGINATION DATE: 6/30/03 REVISED 10/9/03 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 6/30/03 Water Impact Fee Wastewater Impact Fee $2,940.00 WAIVED Park Fee n/a Roadway Impact-Zone $4,814.63 $4,814.63 rb 7/15/03 Street Sign Street Light 11/3/03 Construction Inspection $3,117.04 6/30/03 $3,117.04 rb 11/3/03 $380.00 rb 7/22/03 Early Grading Permit $380.00 Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection $150.00-'"~ $5o.ooj $205.28/ ~\~.1~ $2,297.72 ~, WAIVED ~ $60.00'~ $5o.oo...,j ~'Subtotal to Eng. $8,311.67 $8,311.67 $0.00 TOTALS TotalFees Fees Paid Amount Owed $14,064.67 $8,311.67 $5,753.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEES PROJECT NAME: First Baptist Church of Coppell Addiiton ENGINEER: Kimley-Horn DRIGINATION DATE: 6/30/2003 REVISED 1019103 SENT ASSESSMENT ASSESSED FEE AMOUNT PAll' DATE 6/30/2003 Water Impact Fee ,,v,~ ~, v~.~ r~n $2,940.00 Wastewater Impact Fee WAIVED Park Fee n/a Roadway Impact-Zone $4,814.63 $4,814.63 rb 7/15/2003 Street Sign Street Light 11/3/2003 Construction Inspection $3,117.04 $3,117.04 rb 11/3/2003 Early Grading Permit $380.00 $380.00 rb 7/22/2003 Overtime Inspection 6/30/2003 Water Tap Inspection $150.00 $150.00 di Wastewater Tap Inspection $50.00 $50.00 di Water Meter (Domestic) $205.28 $205.28 di Water Meter (Fire/Irrig) $2,297.72 $2,297.72 di Meter Deposit (Domestic) WAIVED di Meter Deposit (Fire/Irrig) $60.00 $60.00 di Utility Final Inspection $50.00 $50.00 di 11/13/2003 11/13/2003 11/13/2003 11/13/2003 11/13/2003 11/13/2003 11/13/2003 ISubtotal to Eng. $8,311.67 $8,311.67 $0.00 Total Fees Fees Paid Amount Owed TOTALS $14,064.67 $11,124.67 $2,940.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.