First Baptist-CS030630 (2)DEVELOPMENT FEES
PROJECT NAME: First Baptist Church of Coppell Addiiton
ENGINEER: Kimley-Horn
ORIGINATION DATE: 6/30/03 REVISED 10/9/03
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
6/30/03
Water Impact Fee
Wastewater Impact Fee
$2,940.00
WAIVED
Park Fee n/a
Roadway Impact-Zone
$4,814.63 $4,814.63 rb 7/15/03
Street Sign
Street Light
11/3/03 Construction Inspection $3,117.04
6/30/03
$3,117.04 rb 11/3/03
$380.00 rb 7/22/03
Early Grading Permit
$380.00
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
$150.00-'"~
$5o.ooj
$205.28/ ~\~.1~
$2,297.72 ~,
WAIVED ~
$60.00'~
$5o.oo...,j
~'Subtotal to Eng.
$8,311.67 $8,311.67 $0.00
TOTALS
TotalFees Fees Paid Amount Owed
$14,064.67 $8,311.67 $5,753.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
DEVELOPMENT FEES
PROJECT NAME: First Baptist Church of Coppell Addiiton
ENGINEER: Kimley-Horn
DRIGINATION DATE: 6/30/2003 REVISED 1019103
SENT ASSESSMENT ASSESSED FEE AMOUNT PAll' DATE
6/30/2003 Water Impact Fee ,,v,~ ~, v~.~ r~n
$2,940.00
Wastewater Impact Fee WAIVED
Park Fee n/a
Roadway Impact-Zone $4,814.63 $4,814.63 rb 7/15/2003
Street Sign
Street Light
11/3/2003 Construction Inspection $3,117.04 $3,117.04 rb 11/3/2003
Early Grading Permit $380.00 $380.00 rb 7/22/2003
Overtime Inspection
6/30/2003 Water Tap Inspection $150.00 $150.00 di
Wastewater Tap Inspection $50.00 $50.00 di
Water Meter (Domestic) $205.28 $205.28 di
Water Meter (Fire/Irrig) $2,297.72 $2,297.72 di
Meter Deposit (Domestic) WAIVED di
Meter Deposit (Fire/Irrig) $60.00 $60.00 di
Utility Final Inspection $50.00 $50.00 di
11/13/2003
11/13/2003
11/13/2003
11/13/2003
11/13/2003
11/13/2003
11/13/2003
ISubtotal to Eng. $8,311.67 $8,311.67 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $14,064.67 $11,124.67 $2,940.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.