Loading...
Freeport NIP(7.1)-CS000114 COPPELL, TEXAS 75019 FO. Box 478 CoppelL Texas 75019 972-462-0022 Januaxy 14, 2000 C. Jack Evans Pacheco Koch Consulting Engineers 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 RE: Freeport North Lot 3, Block A Fee Assessment Letter Dear Mr. Evans: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $37,191.77 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or euntract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Freeport North Lot 3, Block A Date: Ol/14/2ooo TOTAL AMOUNT DUE FEES DUE PRIORTO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $384.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,409.25 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireliue Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permi0 Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $18,066.77 $18,066.77 (100% due prior to Council Approval) Street Light Fee [nformation not Available (100% due prior to Acceptance of Project II Street Sign Fee [nformatiun not Available <100% due prior to of Project II Construction Inspection Fee haformation not Available Il I~OTAL $41,515.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $37,'191.77 DEVELOPMENT FEE WORKSHEET PROJECT: Freeport North Lot 3, Block A DATE: 01/14/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch = 16 ESU's I - 2 inch = 8 ESU's 0 = 0 ESU's 1 - 8 inch -- 2.5 ESU's Total #: 26.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: 4 Connections @ $50.00 ea. (Single tamily due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee-' Total #: 2 Domestic Meter(s) @ $192.05 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigatio~/[q'JreU~e Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $3,217.20 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESt's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prier to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $11,925.00 $200.00 $384.1o $192.05 $o.o0 $3,217.20 $70.00 $60.00 $7,200.00 $100.00 $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $18,066.77 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that ara inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Freeport North Lot 3, Block A 01/14/2000 ROADWAY IMPACT FEE: Service Area * 4 Category ** Industrial Land Use ** General Light Industrial Building Area (st) 227,255 Development Units ** 227.26 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $72,267.09 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75 % Total Credit $54,200.32