Januaxy 14, 2000
C. Jack Evans
Pacheco Koch Consulting Engineers
9401 LBJ Freeway, Suite 300
Dallas, TX 75243
RE: Freeport North Lot 3, Block A
Fee Assessment Letter
Dear Mr. Evans:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $37,191.77 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need to be paid prior to Council approval. Please refer to
the attached table for additional fees. Also provide a copy of the Engineer's estimate or
euntract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Kent M. Collins, P.E.
Civil Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Freeport North Lot 3, Block A
Date: Ol/14/2ooo
TOTAL AMOUNT DUE
FEES DUE PRIORTO
COUNCIL
APPROVAL
Water Impact Fee $11,925.00 $11,925.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $384.10
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $3,409.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $70.00
(100% due at Issuance of Water Meter)
Irrigation/Fireliue Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,200.00 $7,200.00
(100 % due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permi0
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $18,066.77 $18,066.77
(100% due prior to Council Approval)
Street Light Fee [nformation not Available
(100% due prior to Acceptance of Project II
Street Sign Fee [nformatiun not Available
<100% due prior to of Project II
Construction Inspection Fee haformation not Available
Il
I~OTAL $41,515.12
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $37,'191.77
DEVELOPMENT FEE WORKSHEET
PROJECT: Freeport North Lot 3, Block A
DATE: 01/14/2000
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
2 - 2 inch = 16 ESU's
I - 2 inch = 8 ESU's
0 = 0 ESU's
1 - 8 inch -- 2.5 ESU's
Total #: 26.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: 4 Connections @ $50.00 ea.
(Single tamily due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee-'
Total #: 2 Domestic Meter(s) @ $192.05
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigatio~/[q'JreU~e Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $3,217.20
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESt's:
16
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prier to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$11,925.00
$200.00
$384.1o
$192.05
$o.o0
$3,217.20
$70.00
$60.00
$7,200.00
$100.00
$100.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid pdor to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$0.00
$18,066.77
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that ara inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Freeport North Lot 3, Block A
01/14/2000
ROADWAY IMPACT FEE:
Service Area * 4
Category ** Industrial
Land Use ** General Light Industrial
Building Area (st) 227,255
Development Units ** 227.26
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $72,267.09
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees 75 %
Total Credit $54,200.32