Loading...
Freeport NIP(7.1)-CS000114 (2)08:11 CIT. Y~OF COPPELL ENGINEERING - CITY OF~PPELL NO. 110 COPPELL. TEXAS RO, BOX 478 COl~Oell, Texas 75019 972-462-0022 Sanuacy 14, 2000 C. Jack Evans Pacheco Koch Consulting Engineers 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 RE: Freeport North Lot 3, Block A Fee Assessment Letter D~c) D~ Mr. Evans: Enclosed is a copy of the City of Coppell Development Fee Ass~sment table, along with a copy of the Development Fee calculations for the referenced c~velopment. Please make payment to the City of Coppell in the amount of $37.191.77 and forward to the Finance Department along with a copy of the Fee ,assessment table. This amount is a portion of the assessed foes that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fcc can be verified. Providing a copy of your paid receipt to the Engineenng Department will help us to verify thc payment of required f~s and insur~ a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg ~'ones, Chief Building Official Gary Sims, Director of Leisure Services ,04x18x00 08:10 CIT~OF COPPELL ENGINEERING 4 CITY OF COPPELL .2 NO. 110 Duke-Weekl Realty, L.P. 4497 P~rk Drfv~ Norcross. Georgia $0095 WACHOVIA SANK OF GEORGIA. N A ATLANTA. GA DATE Apd113,2000 Pay:** ...... ****Fo~y-one thousand five hundred fifteen dollars and 12cents CHECK NO. AMOUNT 64490 $***"41,515.12 'AY City Of Coppell TO THE ORDER OP B4/18/88 E)8:11 CITY'OF CO~LL ENGINEERING -+ CITY OF COPPELL DEVELOPMENT FEE WORKSHEET PROJECT: Freepor~ No,fA Let 3, Black A DATE: 01/14/2000 Water Impact Fee: Domestic Meter(s): irrigation Meter(S); Flreline Metar(s): 2 - 2 inch = 16 ESU's 1 - 2 inch = 8 ' ESU's 0 ,,, 0 ESU's 1 - 0 ~ = 2.5 ESU'a Total #: 26.5 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) NG. 11;) $11,925.00 [~1]. Water Tap Inspection Fee: Total · 4 Connections ~ S50.00 ee, (Single family due prior to issuance of building permit) (Afl other deveio~ts due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) ~ $192.05 (Single family due prior to issuance of building permit) (NI other developments due prior to issuance of meter) Clrrigation/lrireline Water Meter Fee: Total #: 1 irrigation Meter(s) O Total #: 0 Additional irrigation Meter(s) ~ Total #: I Fireline Meter(s) {~ (100% due prior to issuanGe of water meters) $192.05 S3,217.20 Domestic Water Meter Deposit Fee: Total #: 2 Melee(s) @ $35.00 ea. (100% due prier to issuance of water meters) lrrigationflqFe Meter Deposit Fee: Total #: 2 Me~er(s) ~ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ S450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections ~ $50.00 ea. (~00% due prior to issuance of building permit) ~-~ Utility Final Inspection Fee (Ail developments): Total #: 2 Lots O S50.00 ea. (l~ue prior to issuance of building permit) $200.00 $384.10 $192,05 ~o.oo ~3,217.20 $70.00 $60.00 $7,200.00 $100.00 $100.00 Page I ~/18/88 ~8:12 NO. 110 CITY'OF COPPELL ENGINEERING '~ CITY OF COPPELL ® 0 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * l~relJminaFy plat approved: 0 0 ,~fl~de-fami~ O $o.00 per tot MulU-fomily O $0.00 per unit (50% paid prio~ to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached foe calculations) Street Lighting Fees: Assessed for lighting in ~o City's right-of-way. This foe cannot be assessed until after T.U. Electric su~mits the lighting plan for the pro(x)sed (Jevolopmeflt. Once the plans are submitted, S292.60 per light will IM assessed. (100% due prior to final occepMnco of development) $18,066.77 Information not Available Street Sign Fees: Assessed for sig~oge in Ule City's right-of-way. (See attached fee calculations if applicable) · Informatlefl not, Available Construction Inspection Fees: A copy of ~e develeq2ment contract must be submitted for assessment. The contracts shoul~l Indicate ~® cost to co~truct ~e improvements Ihat are inspected by the Engineering Deparlmeflt. (2% of development cost required for private im~ovements) (4% of development cost requU'ed for public imlxovements) Inf~ not Available Page 2 04/18/08 08:11 CITY. OF COPfDELL ENGINEERING -~ CITY OF COPPELL NO. 110 DEVELOPMENT FEE TABLE Project: kS'eej~n North Lot $, B/ock A D~te: 01/14/200o TOTAL ~OUNT DUE FI~-~ DUE PRIORTO COUNCIL APPROVAL water'Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $384.10 (100% due at Issuance of Water Me,er) Water Meter Fee (lrrigatiotYFireline) $3,409.25 (100% due at Issuance of Water Meter), Water Meter Deposit (Domestic) $70.00 (100% due at Issuance o.f .W.. ater Meter) Irrigation/Fireliae Meter Deposit $60.00 (100% due at lsmmnc, e of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to C.o. uueil Approval) Wastewater Tap InspectiOn Fee $100.00 (100% due at Issuance of Building. Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Coanr-il Approval) Roadway Impact Fee $18,066.77 $18,066.77 (100% due prior to Council Approval) Sueet Light Fee Information not Available (100% due p~i~T to A ,c~*ptance og, ,.Project ~ Strut Sign Fee Information not Available (~00% due prior to Ao:q,t~ of Proj~:t I[ Construction Inspection Fee information not Available TOTAL $41,515.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $37,'191.77 NO. 110 ~1~ PlZO. IECT~ DATE: C ! TY' OF' C(~°PELL ENG ! NEaR ! N~ -+ C I TY 13F' CO~°F~LL RO.a.~Wl¥ ll~ FEE C~LCUI.&TION$ * (Figure 2 - Roadway In~paot Fee Study) ** (Table 3 - Roadway Impact ~ ~udy) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Pet..at of Credit Toward Roadway hnt~act Total Credit S54,200.32 ~. ....... ~ -- . .