Freeport NIP(7.9)-CS020614DEVELOPMENT FEES
6/14/02
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
Water Impact Fee $,5,180,00
Wastewater Impact Fee $2,240.00
Street Sign
Street Ught
6/17/02 Construction Inspection $11,421.22 $11,421.22 rb 6/17/02
Roadway Impact-Zone N/A
Early Grading 2% $2,092.54
OverHme Inspection
Water Tap Inspection $200.00
Wastewater Tap tnspectior $50.00
Water Meter (Domestic) $205.28
Water Meter (Fire/Irrig) $4,390.16
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $90.00
Utility Final Inspection $50.00
Subtotal due to Eng,
5/3/02 $2,092.54 rb 5/3/02
$13,513.76
TotalFees
TOTALS $25,949.20
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Canst. Plan Approved
$13,513.76 $0.00
Fees Paid Amount Owed
$13,513.76 $12,435.44
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
DEVELOPMENT FEES
PROJECT NAME: Uline (Freeport North, Duke-Weeks Lot 5 BIk A)
ENGINEER: Pacheco Koch
OR G NAT ON DATE: 6/14/02
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
Water Impact Fee $5,180.00
Wastewater Impact Fee $2,240.00
Street Sign
Sffeet Light
6/14/02
6/17/02 Construction Inspection $11,421.22 $11,421.22 rb 6/17/02
5/3/02 $2,092.54 rb 5/3/02
Roadway Impact-Zone N/A
Early Grading 2% $2,092.54
Overtime Inspection
Water Tap Inspection $200.00
Wastewater Tap Inspectior $50.00
Water Meter (Domestic) $205.28
Water Meter (Fire/Irrig) $4,390.16
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $90.00
Utility Final Inspection $50.00
Subtotal due to Eng.
$13,513.76
$200.00 di 6/20/02
$50.00 di 6/20/02
$205.28 dl 6/20/02
$4,390.16 di 6/20/02
$30.00 di 6/20/02
$90.00 di 6/20/02
$50.00 di 6/20/02
$13,513.76 $0.00
TotalFees Fees Paid AmountOwed
TOTALS $25,949.20 $18,529.20 $7,420.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Ptan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.