Freeport NIP(3)-CS 951215DATE:
TO:
FROM:
RE:
COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM
December 15, 1995 ~
Larry Davis, Construction Inspector
Howard Pafford, Utilities Superintendent ~-
Walk thru for Craftmade
A follow-up walk-thru was done 12/15/95 on the above referenced project. The items
below were found to be outstanding.
1. Double checks on meters have not been tested.
Pleaae ensure that these items get taken care of and if you have any queafions, please
give me a call.
HLP/dg
COPPELL PU~LTC ~ORI~
DATE:
TO:
FROM:
RE:
December 13, 1995
Water/Sewer Punchlist Walk-Through for Craftmade
A follow up walk-thru was conducted at the above reference site
and all punchlist items had been corrected.
If you have any questions regarding this matter please advise.
HLP/hp
ENGiNEERiNG D~V~ON
DATE:
TO:
FROM:
RE:
Deceml:~er 6, ~995
Larry Davis, Construction Inspector
Howard Pafford, Utilities Superintenden,~
Water/Sewer Walk-thru Punch List for Craftmade
A walk thru was conducted on 12/5/95 for the above referenced
project. The following items were found to be deficient.
Ail three stacks in median at tie in needs to be
straighten, cleaned, and concrete pads repoured.
Check the flows on the internal fire hydrants on
private property, seems to be flowing slow.
Repair existing fire hydrant valve stack.
Please ensure that these items are corrected prior to final
acceptance and contact me if you need any additional information.
HLP/dg
12/01/95 16:45 CITY 0~ COPPELL ENGINEERING ~ SERUICE CE~CR
- ~,,.__~ ~ ) The City Witfl A Beaut'u tufa
Mr. Robert Ahmuty
M.E.P.C. American Properties
15303 Dallas Parkway, Suite 100, LB 10
Dallas, Tex~s 75248
RE: Craftmade, Frerport North Industrial Park, Lot 3R
Dear Mr. Ahmuty:
N0.798
P.O. Box 478
Co~Oell. Texas 7501
214-462-0022
Ple~qe bc advised that a walk-through has been scheduled for, Tuesday, December $, 1995 at
9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities axe clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call at your earliest convenience.
Construction InspeCtOr
CC:
Dave Vandemeer, McFadden & Miller
John Skinner,Patco Utilities
/eft $ones, Fire Marshal
Cn'eg/ones, Building Official
Mike Martin, Asst. City ~%4neer
Larry Davis, Construction Inspector