Loading...
Freeport NIP(3)-CS 951215DATE: TO: FROM: RE: COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM December 15, 1995 ~ Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent ~- Walk thru for Craftmade A follow-up walk-thru was done 12/15/95 on the above referenced project. The items below were found to be outstanding. 1. Double checks on meters have not been tested. Pleaae ensure that these items get taken care of and if you have any queafions, please give me a call. HLP/dg COPPELL PU~LTC ~ORI~ DATE: TO: FROM: RE: December 13, 1995 Water/Sewer Punchlist Walk-Through for Craftmade A follow up walk-thru was conducted at the above reference site and all punchlist items had been corrected. If you have any questions regarding this matter please advise. HLP/hp ENGiNEERiNG D~V~ON DATE: TO: FROM: RE: Deceml:~er 6, ~995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintenden,~ Water/Sewer Walk-thru Punch List for Craftmade A walk thru was conducted on 12/5/95 for the above referenced project. The following items were found to be deficient. Ail three stacks in median at tie in needs to be straighten, cleaned, and concrete pads repoured. Check the flows on the internal fire hydrants on private property, seems to be flowing slow. Repair existing fire hydrant valve stack. Please ensure that these items are corrected prior to final acceptance and contact me if you need any additional information. HLP/dg 12/01/95 16:45 CITY 0~ COPPELL ENGINEERING ~ SERUICE CE~CR - ~,,.__~ ~ ) The City Witfl A Beaut'u tufa Mr. Robert Ahmuty M.E.P.C. American Properties 15303 Dallas Parkway, Suite 100, LB 10 Dallas, Tex~s 75248 RE: Craftmade, Frerport North Industrial Park, Lot 3R Dear Mr. Ahmuty: N0.798 P.O. Box 478 Co~Oell. Texas 7501 214-462-0022 Ple~qe bc advised that a walk-through has been scheduled for, Tuesday, December $, 1995 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities axe clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call at your earliest convenience. Construction InspeCtOr CC: Dave Vandemeer, McFadden & Miller John Skinner,Patco Utilities /eft $ones, Fire Marshal Cn'eg/ones, Building Official Mike Martin, Asst. City ~%4neer Larry Davis, Construction Inspector