Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Freeport NIP(3)-CS 951030
DEVELOPMENT FEES iIPROJ ECT NAME: IENGINEER: IREVISION DATE: MEPC American Properties-Freeport North Lot 3R Albert H. Halff Associates, Inc. 10/30/95 SENT 5/31/95 10/19/95rev 5/31/95 10/19/95rev 5/31/95 10/19/95 8/7/95 8/14/95 8/21/95 9/19/95 ASSESSMENT Park Fee Water Impact Fee Water Impact Fee Wastewater Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Const. Inspect. (Sidewalk) Irrigation Street Escrow Street Cut Permit Utility Final Inspection Overtime Inspection (8/5) Overtime inspection (8/12) Overtime Inspection (8/19) Overtime Inspection (9/16) TOTALS ASSESSED FEE AMOUNT PAID DATE $8,325.00 $8,325.00 6/20/95 $3,600.00 $3,600.00 10/20/95 $3,600.00 $3,600.00 6/20/95 93,600.00 93,600.00 10/20/95 $867.18 9867.18 6/29/95 9735.32 9735.32 10/17/95 $100.00 9100.00 10/24/95 950.00 950.00 10/20/95 9116.00 $116.00 9/26/95 9232.00 9232.00 9/26/95 9116.00 9116.00 9/26/95 9116.00 $116.00 9/29/95 Total Fees $21,457.50 NOTES Fees Paid(//~Amount O~e~ $21,457.50 ~ $0.0_~0 6/29/95 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. irrigation Plan Approved Erosion Control Maint.