Loading...
ST9302-CS 990316M~.~R-- 16--99 PM R~ 97224~$604 97~426604 P. ~1 Dete: To: Rlmex Conetruotion Co., In(=. P,O. Box 111876 Cin'olKon, TixI$ ?$011-1876 2335 Sandy Lake Rd. Cerrol~on, Texle ?5006 From: Peter Sturdlvant Telephone (972) 242.2368 Me$1&ge: Fix (972) 242-6804 Number of paget including cover p~ge: i: '* if you do not reoelve iii pegee0 plelle (=ontlot ul It the lbove telephone number. ,~,~.' . . '!:~iii~'A'R,--16--99 84:52 PM R~mez Const. ruc. t. ion 9]'22426684 Ramex Construction Co Inc. '~[,i.,, (._~x) General Contractors March 15. 1999 Mr. Michael Martin City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 P.02 2335 Sandy Lal~a Rd, Carrollton, Texas 75004 P.O. Box 111876 CarroIlton, Texas 75011-1876 Main: (972) 242-2368 Fax: (972) 242-6604 Re: Sandy Lake Road Dallas County Project No. 91.838 Dear Mr. Martin, Attached is our Traffic Control Plan which we discussed earlier today. Please call me if you have any questions. Sincerely, Ramex Construction Co., inc. Peter Sturdlvant Project Engineer MAR--16--99 84 ~'52 PM # R~mez Cons%rue% i on 9722426684 Traffic Control Proposal For the Movement of Bridge ~eame Through the Intertection of Denton Tap Rd. & Sandy Lake Rd. Stage the trucks on Beltline Rd. at a point north of 1-635, in the area of TXI and the perk. The earliest this can o~.,ur is between 9:30 and 10:00 am, At the appointed time, stage one (1) truck in the curb lane of Southbound Denton Tap Rd. near the intersection of Sandy lake Rd. 3. Stop traffic at the Inter~ecfion. 4. Truck will proceed from the curb lane to the Westbound lanes of Sandy Lake Rd. After this maneuver is successful, 6. Stage eleven (11) trucks in the curb lane of Southbound Denton Tap Rd. 6. At the discretion of the City of Coppell, stop traffic for the completion of the operation, After the first truck has successfully negotiated the Intersection, we expect this operation will require approximately one-half hour. T ~ ~ r I