Loading...
Freeport NIP(3)-CS 950531CITY OF COPPELL DEVELOPMENT FEES Date: May 31, 1995 Project: MEPC American Properties/Freeport North Lot 3R TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee q~ ~) ~-~}00~' $300.00 ~t~. 4)_ (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- 4)- (100% due at Issuance of Building Permit) Utility Final Inspection Fee~50.00. ~.O~, -0- (100% due at Issuance of Building Permit) (100% due at Issuance of Water Meter) -?° Water Meter Deposit ~ '~:~:~ ~o~0~ 3 5,e~ -0- (100% due at Issuance of Water Meters) Water Meter Deposit (Residential) -0- -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) tt~q q~f, ~o OtA.>e -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit ~-~(~, ~' 00~-_i 4)- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- Street Excrow -0- -0- (100% due prior to Council Approval) Construction Inspection Fee need submittal of 4)- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $15,105.50 $ 11,925.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: MEPC American Properties-Freeport North Lot 3R Albert H. Halff Associates, Inc, 9/21/95 SENT 5/31/95 5/31/95 8/7/95 8/14/95 8121/95 9/19/95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection (8/5) Overtime Inspection (8/12) Overtime Inspection (8/19) Overtime Inspection (9/16) ASSESSED FEE 98,325.00 93,600.00 AMOUNT PAID DATE //// /20/95 9867.18 9867.18 6/29/95 9116.00 9232.00 9116.00 9116,00 TOTALS TotalFees 913,372.18 Fees Paid Amount Owed 912,792.18 9580.00 NOTES 6~29~95 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. The City With A Beautiful Future June 2, 1995 Mr. Ab Atldns MEPC American Properties Inc. 15303 Dallas Parkway Suite 100 LB 10 PUBLIC WORKS Dallas, Texas 75248 .~ AmeriganS~~eeport North Lot 3R, Deve o~ent Fee Assessment D. Box 478 )ppell, Texas 75019 4-462-0022 Dear Mr. Atldns: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Freeport North Lot 3R. Please make payment to the City of Coppell in the mount of $11,925.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer CC: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager DATE: TO: FROM: RE: COPPELL ENGINEERING MEMORANDUM Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for MEPC American The following fees referenced project. Water Impact Fee: 1 - 2" 1 -2" 1 -8" Total 18.5 should be assessed and collected on the above Domestic Meter/s = 8 ESU's Irrigation Meter/s = 8 ESU's Fireline Meter/s = 2.5 ESU's ESU's ~ $450.00 ea = $ 8,325.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $~00.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (All Development) 1 lots ~ $ 50.O0/lot = $50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 2" Domestic Meters @ $173.65ea. = $173.65 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 2" 1 8" (Irrigation/Fireline) Irrigation Meter/s @ $173.65 ea Fireline Meter/s @ $ 2,378.20 ea 100% due prior to issuance of water meter/s. = $173.65 = $2,378.20 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $70.00 lOO% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $35.00 100% due prior to issuance of water meters. ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: MEPC American Properties / Freeport North Lot 3R 6/5/95 STREET ESCROW: Street Name(s) Street Type Cost per Foot Royal Lane P4D/6 $0.00 *** 0 Len{~th of Adjacent Frontase (Linear Feet) Escrow due = (Cost per Foot) x (Length of Adjacent Frontnge) = ROADWAY IMPACT FEE: Service Area * 4 Category ** Industrial Land Use** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Developmem Unit ** Fee per Vehicle Mile General Light Industrial 368,000 368 1.06 $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $117,024.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Road has been upgraded) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.