Loading...
Freeport NIP(7.9)-CS021023 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Engineering Danny Hightower, Utilities October 23, 2002 Walk-thru for Uline 1. ~'~Manhole missing rain pan 2. c/ Blocking in vault under valves (2 vaults) 3. ~/Vault small ball valves need plugs (2 vaults) 4. ~'~Drainage around vault to run off 5. eed two pads: 1~ FH and MVL 6. I~ 1 ~ FH needs chains 7. t//Paint all FH red 8. L/~Caunot check 1~ FH; PSI cap will not come off 9. ~ FI-I needs chains on FH caps 10. ~4~ FH needs washer replaced to stop leak 11. WAD not ready to inspect; will inspect on follow-up 12. 'J~y~d letter from landscaper: Not to cover manholes or valves 13. v/ Check for test paperwork on two vaults and one 2" domestic 14. i~" irrigation needs test paperwork from landscaper 15. V~" irrigation needs plugs (4) in DC 16. t~lace pad on 2" domestic and irrigation curb stop 17. ~Check pad to vault and 2" services on follow-up 18. ~MMark WAD in red on curb Call Danny Hightower at 972-304-3545 to schedule follow-up to check punch list. CITY OF COPPELL PUBLIC WOR~$ DEPARTMENT ! I l/ MESSAGE CONF I RMAT I ON 10×24×02 12:29 ID=CITY OF COPPELL DATE S,R-TIME DISTANT STATION ID MODE PAGES 00'~)G" ~72 304 7041 CALLING 01 RESULT OK 0000 COPPELL Department of Public Works November 19, 2002 09:32 am Water Name Address Cross Street Location Description Mike Cox Duke Constr. 635 Freeport WOWA-02-0289 (H) (W) 214 334 8400 Common Area Final walk thru 2 p.m. Wed. 11/20/02 for U-Line. Walk Throu~lh [~ Left Door Knocker Spoke to Resident [~ Called Resident Notify Water Billing Office Comments Old Meter # Reading New Meter # Reading Assigned To Danny Hightower Personnel Assigned Hours Field Comments: Quantity Parts - Equipment Used Signature: ~..~~ Date: //;.~--~¢.~ Time: P.O. Box 9478 · 732 Deforest Road - Coppell, TX 75019 - Phone (972) 304-3545 - Fax (972) 304-3547 From: To: Date: 10/15102 3:07PM Subject: ULINE walk-ljlru rescheduled / Per Larry Davis - the final walk'thru for paving, utilities and drainage on the referenced project has been rescheduled for Wednesday, October 23rd at~2:00 p.m. Rhonda Brothers Glenn Hollowell; Greg Jones; Lee Stone; Michael Corder; Roland Asebedo Rhonda Brothers Engineering Dept. Secretary COFFELL Water Name Address Cross Street Location Larry Davis Engineering Freeport Unkno~al Department of Public Works October 14, 2002 01:25 pm WOWA-02-008$ (H) (VV) X3679 Walk Through Left Door Knocker Spoke to Resident Callc~l Resident Notify Water Billing Description Final walk-thru for ULINE (Duke-Freeport) for Thursday, October 17th at 9:00 a.m. for utilities. Office Comments Assigned To Danny Hightower Old Meter # Reading New Meter # Reading Personnel Assigned Hours Quantity Parts - Equipment Used Field Comments: Signature: Date: Time: P.O. Box 94.76 - 732 Defoe'est Road - CoppeH, TX 76016 - Phone (972) 304-3545 - Fax (972) 304-3647