Loading...
Freeport NIP(7.9)-CS020617SENT BY: CITY OF COPPELL; JUN-t7-02 3:25PM; PAGE TO: 8ERVICE CENTER 972 304 7041; AT: §72,304,35~7 /~las, TX 75240 RE: Duke-Fr~port Addition, Lot 5, Block A (U-lin~, Inc.) POSt-it' Fax Note 7671 Date fo }~ ~[~M From Phone' Phone ' ~.~: ~ Dear Mr. Langston: Enclosed is a copy of the City of Coppell Development F~c Assessment Table, along with a copy of the Development Fee calculations for the referenced development. There arc no fees due prior to Council approval. Please note that thc Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer fees until thc issuance of a Building Permit. Construction Inspection fees ba~cd on the Engineer's estimate or contract will be due prior to thc scheduled pre-construction meeting. Please provide a copy of thc Engineer's ~timate or contract to this office so that the 2% and 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees arc paid. Appropriate paymem of the required fees will help insure a successful lx:glnning of the project. Wc look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Sincerely Kenneth M.~. Director of Engineering & Public Works Office Phone: (972) 304-3686 Fax: (972) 304-7041 CC: Jennifer Armstrong, Finance Director Greg Jones, Building Official Glenn Hollowell P.E., Asst. Dir. of Public Works Rhonda Brothers, Engineering Secretary BENT BY~ CITY OF COPPELL; G72 304 704i; JUN-J7-02 3:25PM; PAGE 2/5 DEVELOPMENT FEE TABLE Project: Duke-Freeport Addition Lot 5, Block~4 (U. Line, Inc.) Date: stme 14,,3002 ~ TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fcc $5,180.00 (100% due at !s-~mnce of D~Min~ Permit) $200.00 Water Tap Inspection Fee (100% due at t~,uance of Water Meter) $205.28 Water Meter Fee (Domestic) (100% dtm at Is~,,~-...c~_ of Water b,qs-ta0 Water Me~¢r Fee (lrrigation/Fimlir~) $4,390.16 ~ 100% due at lss~c¢ of Water M~ter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) ' Itrisatioa/Fireline Meter Deposit $90.00 (100% due at Iss-an~e of Water Meter) Waatewater Impact Fee $2,240.00 ti 00% due at lss,,~,~e~ of Building Permit) · $50.00 Wastewater Tap Inspection Fee (100% du~ at lss,_,_-nee of Buildin~ Permit) $50.00 Utility Final Inspection Fee ( 100% due at Issuance of Building Permit) ~ark Fee $0.00 $0.00 (! 00% due prior to Council Approval) $0.00 $0.0~ I~oadway hnpact F¢¢ '4100% due prior ~o Codicil Approval) Street Light Fee information not Available gl00% due prior to Acc~ptaac~ of Project) Information not Available Street Sign Fee (100% due prior to Acceptance of Project) ~ - Construction Inspection Fee nforraation not Available i00% due riot to Start of Construction) ~ ~ TOTAL $12,435.44 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 SENT BY~ CITY OF OOPPELL; 872 304 7041; JUN-IT-02 3:26PM; PAOE 3/5 ROADWAY IMPACT FEE CALCULATIONS PROJECT: D~l~-FreeporlAdd#lo~ Lot 5, fl/ock .,1 (U-Line, Ina) DATE: J~ne 14.2002 ~OADWAY LNfPACT FF.E: 4 ~velo~; Uni~ * * 159. I 7 I.~ V~hlele Mi]~ ~ Devel~,~ Unit .... S3~ ~ ~ V~cl~ Mile Veh~c~ ~i~ ~r De~l~t U~t~ x ~F~ ~ Vehici~ Mile) = S50,61 S.42 * (Fib. ute 2 - Roadway Impact Fee Study) ** (Table ~ - Roadway hnpact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Cn~lit Toward Roadway Impact Fees Total Cz~lit [ AMOUNT DUE: 100% $o.00 1 GENT BYe CZTY OF COPPELL; 972 304 704t; JUN-t7-02 3:2GPM; PAGE 4/5 DEVELOPMENT FEE WORKSHEET PROJECT: Duke-Fr~elMrt Addition Lot 5, Bloc/; A ([r-Li~e, In~.) DATE: June 14,2002 Waf~r Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fire#ne Meter(S): t - 2 inch = 8 ESU'$ I - 2 inch = 8 ESU'$ 0 = 0 ESU'$ 2 - 5 inch = 2.5 ESU'$ Total#: 18.5 ESU's Q $280.00 ea. (Due' p~;~or to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections (~ $50.00 ea. (Single family due prior to lesuence of buil0ing permit) (All other developmentS duo prior to Issuance of meter) Domestic Water Meter Fee: Total ~. I Domestic Meter(S) ~ $205.28 (Single family due prior to issuance of building permit) (All other developmefltS clue I~-ior to issuance of meter') Irrigatioa/Firefine Water Meter Fcc: Total #: I Irr~ation Meter(s) ~ $205.28 Total ~ 0 Additional I~ga§on Meter(s) ~ $0.00 Total #: 2 Firellne Meter(s) ~ $2.092.44 (l~ue prior to issuance of water meters) Domestic Water Meter Deposit Fee: To,al #: I Meter(s) Q &3o.oo ea. (100% doe ixior to issuance of water meters) lrri~ation/l;Jre Meter Deposit Fee: Total #: 3 Meter(s) ~ S30.00 ea. (100% due prior to issuance Of water meters) Wastewatcr Impact Fee: To,al Domestic Metem ESU's: 8 (Due prior to issuance Of building permit) ~ $280.00 ea. Wasteweter Tap Inspection Fee: Total #: I Connections ~ $50.00 ea. (100% clue prior to issuance of building permit) Utility Final Inspection Fee (All developmeuts): Toted #: I Lots O $50.00 ea. '(100% due p~ioc to issuance of building permit) $5~180.00 $2,oo.oo $205.28 $2os.2 S0.00 $4~184.88 $30.00 $90.00 $2.240.00 $50.00 Page 1 CITY OF COPPELL; §72 304 704i; JUN-J7-02 3:26PM; PA~E 5/5 DEVELOPMENT FEE WORKSHEET Park Fee (Ear Resideatial Developments Only): * Prclimhary plat approved: 0 .. Sing~faml~ ~ ~.00 ~r ~t 0 Mu~mi~ ~ $0.~ ~r una (~% ~ p~ to ~u~l ~al of fln~ p~) (50% ~ at i~a~ of bu~lng ~) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fee~: Asse~ for lighting in the City's right-of-way. This fee cannot be assess~;I until after T.U. Electri~ submits t~e lighting plan for ~a proposed devalopme~t Once the plane are submitted, $292.60 per light will be a#er~ed. (100% due prior to final acceptance of development) $o.oo $0,00 Information not Available Street Sip Fees: A~essecJ for $ignege in the City's right-of-way. (Sea al~ed fee calculations if applicable) Information not Available Construdion Impection Fees: A copy of the development contract must be submitted for assessment. The ceeb'acts should indicate the co~t to ~onst~uct the improvements mat are inspected by t~e Engineering Oepartment. (2% of development cost required for private improvements) (4% of devalopment ~ required for public improvements) information not Available Page 2 MESSAGE CONF I RMAT I ON 06x l?/E~2 16:88 ID--CITY OF COPPELL DATE 06/1'7 S,R-TIME DISTANT STATION ID MODE PAGES 4?" 9?28382299 CALL ! NG 06 RESULT OK 0000