Loading...
ST9302-CS 990309FAX (214) 352-3201 fT~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 March 9, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re~ Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: Enclosed for your review and approval is a detour plan for the closure of Heartz Road on the north side of Sandy Lake Road to facilitate the installation of the 30" Coppell water line, storm sewer lateral8 to the edge 'of SandylLake Road, and the manhole at STA 17+06.57 Lt. Due to the depth of the Utilities bn the Heartz Road portion of this intersectioni the safest method of. construction for the traveling public and the construction workers will be to close the north side of this intersection and detour the traffic onto Parkway Boulevard. Based upon M-CO's productions on the 30" water line, it appears that they will need to close the intersection on approximately March 18, 1999. The intersection should be closed for 7 to 10 days and then reopened to normal traffic flow. Please provide our office with your decision regarding this closure at your earliest convenience. If you have any questions regarding this issue, don't hesitate to contact our office. Sincerely, E~~~ns~ion Compan~ Robert D. Weber Project Engineer xc: Michael G. DeM0tte, Kimley,Hom and Associates, Inc., 801 Cherry Street,~ Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER OFFICE: M-Co Construction, Inc. 6816 Harmonson N. Richland Hills, Texas, 76180 Metro(817) 589-7601 FAX: Metro(817) 589-9155 February 24, 1999 Robert Weber Ed Bell Construction, Inc. 10605 Harry Hines Blvd. Dallas, Texas 75354-0787 RE: Sandy Lake Road Project / City of Coppell Submittals Sir:. Due to the proposed storm drain and manholes being so deep and in the middle of Heartz Street. We request that Heartz Street be closed to through traffic from Sandy Lake Road and Parkway Boulevard until this work can be completed. I have included a traffic control plan that will show how traffic will be routed. All spacing and signing will be per Texas Department of Transportation - Barricade and Construction Standards. Thank You, AIf~'d Main Estimator M-CO Construction, Inc. M-Co Construction, Inc. Sandy Lake Road Project / City of Coppell Detour Chaucer Court Detour Work' Area Detour Parkway Blvd. Road Closed to Through Traffic ~- Road Closed Sandy Lake Road Heartz Road will be temporarily closed March 15 through Friday, March 19 for the installation of a 20' deep, 43" storm .drainage system between Chaucer Ct. and Sandy Lake Rd. SORRYFOR THE INCONVENIENCE Stan Phillips, Sandy Lake Rd. Inspector 972-745-6592 City of Coppell Engineering Department 9 72-304-36 79