Loading...
Freeport NIP(7.5)-CS011005T H "f · (2 I T Y · 0 F October 5, 2001 Jeff Langston Duke-Weeks Realty 5495 Belt Line Rd., Suite 360 Dallas, TX 75240 RE: Freeport IX Final Acceptance Dear Jeff: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Ken Griffin, Director of Engineering Rhonda Brothers, Engineering Secretary Greg Jones, Chief Building Official Travis Crump, Fire Marshal