Freeport NIP(7.5)-CS011005T H "f · (2 I T Y · 0 F
October 5, 2001
Jeff Langston
Duke-Weeks Realty
5495 Belt Line Rd., Suite 360
Dallas, TX 75240
RE: Freeport IX
Final Acceptance
Dear Jeff:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
Ken Griffin, Director of Engineering
Rhonda Brothers, Engineering Secretary
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal