Freeport NIP(4)-CS 960228i Beautiful Future IIL.J)~ .... .~ 'il I~4'462'~22
75019
~t_.PUBL~ORK~...
February 28, 1996
MEPC American Properties Inc.
15303 Dallas Parkway
Suite 100, LB l0
Dallas, Texas 75248
RE: MEPC Phase H
Development Fee Assessment
Dear Sir:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee calculations for MEPC Phase II.
On January 24, 1996, the water impact, waste water impact, sewer tap inspection and utility final
inspection fees were paid. The remaining fees are due either at the issuance of the water meter or
the issuance of the building permit. The original development fees for MEPC Phase II were revised
on February 17, 1996 to show only one Water Impact Fee for the fire line meter. Therefore, you
have overpaid your Water Impact Fee in the amount $1,125.00. A check will be processed to you
in that amount.
If you should have any questions please feel free to contact me at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Ted Dutt, Interim Utilities Superintenden[~
Greg Jones, Chief Building Official
Per Birdsall, Interim Street Superintendent
Rick Wieland, Parks Development Coordinator
CITY OF COPPELL
DEVELOPMENT FEES
Date':
Project:
February 28, 1996
MEPC Phase H
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 8,325.00 8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 400.00 -0-
(10095 due at Issuance of Water Meter)
Wastewater Impact Fee 3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee ~i!iiii~ -0-
(100 % due at Issuance of Building Permit)
Utility Final Inspection Fee ~i~i~??; ~;~ i~i~ -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 186.65 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residemial) 105.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 5,102.65 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee -0- -0-
Street Escrow -0- -0-
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of -0-
(2% of Project Cost due prior to Preconstr. Mtg.) comracts
TOTAL $ 18,004.30 $ 11,925.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPP~F,n ENGINEERING
~EHORANDUN
DATE:
TO:
FROM:
RE:
The following fees
referenced project.
February 17, 1996
Mike Martin, Assistant city Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for MEPC PHASE II
(Revision)
should be assessed and collected
Water Impact Fee:
100% due prior to Council approval
1 - 2" Domestic Meter/s = 8 ESU's
1 - 2" Irrigation Meter/s = 8 ESU's
1 - 8" Fireline Meter/s = 2.5 ESU's
Total 18.5 ESU's ~ $450.00 ea = $8.325.00
of the final plat.
on
the
above
Wastewater Impact
1 - 2" Domestic Meter/s = 8 ESU's
Total 8 ESU's ~ $450.00 ea = $3.600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections ~ $100.00 each = $400.00
100% due prior to issuance of buildingpermit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
2 Connections ~ $100.00 each = $ 200.00
100% due prior to issuance of building permit.
(Residential only)
Develo~ent Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots ~ S 50.00/lot = S50.00
100% due prior to issuance of building permit.
Water Heter Fee (Domestic)
1 - 2" Domestic Meters @ S186.65 = S186~65
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water HeterFee (Irrigation/Fireline)
1 - 2" Irrigation Meter/s ~ S186.65 ea. = $186.65
2 - 8" Fireline Meter/s ~ $ $2.458.00ea. = $4o916.00
- Fireline Meter/s @ $
Total
100% due prior to issuance of water meter/s.
Water Meter Depesit (Hulti-F~m~ly or Non-Residential)
3 Meters ~ S$5.00 ea = $105.00
100% due prior to issuance of water meters.
S5.102.65
Irrigation HeterDeposit
1 Meters @ $35.00 ea = S35.00
100% due prior to issuance of water meters.