Loading...
Freeport NIP(7.5)-CS010323DEVELOPMENT FEES PROJECT NAME: ENGINEER: or G NATION DATE: SENT 2% & 4% 5/14/01 6/4/01 6/11/01 6/25/01 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Duke-Freeport Addition Lot 4 & 4X, Block A (Freeport IX) 3/23/01 ASSESSED FEE AMOUNT PAID DATE $8,325.00 $8,325.00 4/27/01 $3,600.00 $3,600.00 4/27/01 noti~ street dept. $29,169.00 $29,169.00 4/27/01 $44,520.00 $44,520.00 4/27/01 $120.00 $160.00 $240.00 $120.00 $200.00 $200.00 5/23/01 $50.00 $189.37 $189.37 5/23/01 $4,504.13 $4,504.13 5/23/01 $35.00 $35.00 5/23/01 $90.00 $90.00 5/23/01 $50.00 Total Fees Fees Paid Amount Owed $91,372.50 $90,632.50 $740.0¢ Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.