Freeport NIP(7.5)-CS010323DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
or G NATION DATE:
SENT
2% & 4%
5/14/01
6/4/01
6/11/01
6/25/01
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Overtime Inspection
Overtime Inspection
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
Duke-Freeport Addition Lot 4 & 4X, Block A (Freeport IX)
3/23/01
ASSESSED FEE AMOUNT PAID DATE
$8,325.00 $8,325.00 4/27/01
$3,600.00 $3,600.00 4/27/01
noti~ street dept.
$29,169.00 $29,169.00 4/27/01
$44,520.00 $44,520.00 4/27/01
$120.00
$160.00
$240.00
$120.00
$200.00 $200.00 5/23/01
$50.00
$189.37 $189.37 5/23/01
$4,504.13 $4,504.13 5/23/01
$35.00 $35.00 5/23/01
$90.00 $90.00 5/23/01
$50.00
Total Fees Fees Paid Amount Owed
$91,372.50 $90,632.50 $740.0¢
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.