Loading...
Freeport NIP(4)-CS 960217CoPPELL ENGINEERING ~EHORANDON DATE TO: FROH RE: The following fees referenced project. Water Impact Fee: i - 2" Domestic Meter/s = 8. ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Febr~arylT, 1996 Mike Martin, Assistant city Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for MEP PHASE II (Revision) should be assessed and collected Total 18.5 ESU's ~ $450.00 ea = 8 32~.00 100% due prior to Council approval of the final plat. on the above Wastewater Impact i - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 connections @ $100.00 each = 400.~ 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 2 Connections @ $100.00 each = $0~.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) ? lots @ = 100% due prior to issuance of building permit. Water Weter Fee (Domestic) 1 - 2" Domestic Meters @ 186._~=186-~'65 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - ~" 2 - 8" (irrigation/Fireline) Irrigation Meter/s ~ ~ = 186~.65 Fireline Meter/s @ $ ~= $4,916.00 Fireline Meter/s @ $ = Total 5 10~.65 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 3 Meters @ $35.00 ea =I05._~ 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea , = $35.00 100% due prior to issuance of water meters. CITY OF COPPF~LL DEVELOPMENT FEES ~Date: ~ February 17, 1996 Project: MEPC Phase H TOTAL AMOUNT DUE ~ PRIOR TO COUNCIL Water Impact Fee 8,325.00 8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 400.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of B. ildin~ Permit) Water Meter Fee (Domestic) 186.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 105.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 5,102.65 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of B,!lding Permit) Street Escrow 0 0 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 18,004.30 $1,1925.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * Thisfeecann~tbea~-~sedunti~a~erTUE~ec~i~submit~th~igh~ingp~anf~rth~pr~p~pmj~t~ Once the plan is submitted, $292.60 per light will be assessed, The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 January 24, 1996 Development Fee Assessment Dea~ Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for ~ O~ .-. ~.c~[~.ok-:-' ~ ~,-o ---+ ~ Please mak~ payment to the City of Coppell in the amount of ~.3.~and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer CCi Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Per Birdsall, Interim Street Superintendent Rick Wieland, Parka Development Coordinator DEVELOPMF~NT FEES Date: . Jamm~y 24, 1996 Project: ~'C Phase H TOTAL AMOUNT DUE ~ PRIOR TO COUNCIL Water Impact Fee 9,450-00 (100% due prior to Council Approval) ~)~ ~).~>-:~ ~ ~, ~,~$,00 Water Tap Inspection Fee 400.00 (100% due at Issuance of Water Meter) Waatewater Impact Fee 3,600.00 3,600.00 (10095 due prior to Council Approval) Sewer Tap Inspection Fee 200.00 (10095 due at Issnance of Building Permit) Utility Final Inspection Fee 50.00 (10095 due at Is$-ance of Building Permit) Water Meter Fee (Domestic) 186.65 (10095 due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 105.00 (10095 due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 6~ (100% due at Issuance of Water Meters) ~ ! Irrigation Meter Deposit 35.00 (10095 due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (5095 due prior to Issuance of Building Permit) Street Escrow O (10095 due prior to Council Approval) Construction Inspection Fee need submittal of (295 of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 24~ TOTAL AMOtr PR Oa TO COUNCm aan, aovAL .... ' Onc~ the plan * This fee canaot be assessed until after TU Electric ~ubnuta the lighlang plan for the proposed project. is submitted, $292.60 per light will be aszessed. COPPELL ENGINEERING HEHORANDUM DATE: TO: FRO~! : RE: January24, 1996 Mike Martin, Assistant city Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for~ The following fees should be assessed and collected on referenced project. Water Impact Fee: 1 - 2" Total Domestic Meter/s = 8 ESU's Irrigation Meter/s = 8 ESU's Fireline Meter/s = ~ ESU's ~ $25, oo ESU's ~ $450.00 ea = $4~00 100% due prior to Council approval of the final plat. the above Wastewater Impact 1 - 2" Total 8 Domestic Meter/s = 8 ESU'S ESU's @ $450.00 ea = 3 6~.00__ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 2 Connections ~ $100.00 each = $ 200.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $ 50.O0/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee 1 - 2" 100% due prior Ail other development fees are due prior to issuance of meter/s. (Domestic) Domestic Meters ~ S186.65 = $186.65 to issuance of building permit for residential only. Water Meter Fee (Irrigation/Fireline) __ - 2" Irrigation Meter/s ~ $186.65 ea. = S186.65 4 91~'0~ - 8" Fireline Meter/s ~ $ $2.458.00ea. = $~'4~S?00~ . . - = Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-F~m~ly or Non-Residential) 3 Meters ~ $35.00 ea = $105.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters..