Freeport NIP(4)-CS 960117ESCROW / ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Freeport North Lot 4R, (MEPC II)
1117196
STREET ESCROW:
treet Name(s) Royal Lane
Street Type P4D/6
Cost per Foot $0.00
Len~h of Adjacent Frontage (Linear Feet) 945.68
Escrow due = (Cost per Foot) x (Len~h of Adjacent Frontage) =
$0.00
ROADWAY IMPACT FEE:
Service Area * 4
Category ** Industrial
[ .,and Use **
Building Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit
Fee per Vehicle Mile
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
General Light Industrial
280,000
280
1.06
$300
$89.040.00:
(Figure 2 - Roadway Impact Fee Study)
(Table 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.
'Creekwiew Dr. located on the north side of
of the development is to be constructed by
the adjacent property. If Creekview Dr.
is not constructed then a Roadway Impact Fee
will be accessed for this development.