Loading...
Freeport NIP(4)-CS 960117ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Freeport North Lot 4R, (MEPC II) 1117196 STREET ESCROW: treet Name(s) Royal Lane Street Type P4D/6 Cost per Foot $0.00 Len~h of Adjacent Frontage (Linear Feet) 945.68 Escrow due = (Cost per Foot) x (Len~h of Adjacent Frontage) = $0.00 ROADWAY IMPACT FEE: Service Area * 4 Category ** Industrial [ .,and Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit Fee per Vehicle Mile Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = General Light Industrial 280,000 280 1.06 $300 $89.040.00: (Figure 2 - Roadway Impact Fee Study) (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. 'Creekwiew Dr. located on the north side of of the development is to be constructed by the adjacent property. If Creekview Dr. is not constructed then a Roadway Impact Fee will be accessed for this development.