Loading...
Freeport NIP(4)-PT 961223Dore/Excav~tlon in Public Right-Of-WaY Permit City of Coppe!l - Public Works Department / IfL pea-mit Issued To: Name: Address: Phone: Emergency Phone: Representing: Tlrpe of Work/General Description: Have ,~% City and/or Franchise Utilitieo Been Contacted and Zxisting utilitie~ Located: ~ YES NO Will It Be Necess~y to Excavate Street, ~ley or Sidewalk payment? YES (attach pe~it) P NO Representative(s) of the Yrancni~elcontr tor must adhere to all construction standards approved by the City of Coppell, which includem but is not limited to: Compaction of Trenches and Bore~, and Barricading according to the Texas ~%nual on Unifo~ Traffic Control Devices. ~ea(a) affected must be remtored to as good condition as before the co~encement of work. ~y excavation requiring closing of a street or alley must be reported to ~he Police, Fire, and P~lic Work~ ~p~ents prior to closing (462-1144, 46~-1133 and 462-8495). Attach Work Order (Franchise 0nly) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contractor Representative Dane Franchise Inspector/or City Inspector Date Date ....... Apolicant shall indemnify and forever hold harmless aqa!nst each an~ eve~; claim, demand or cause of action that may be made or come against -it by reason of or if any way arising ou~ of the closure, blockinq, excavating, cutting, tunneling, or other work by the applicant under perm. it from the City, Lf such pe-~m, it is granted. PEri, IT. PHB All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. NO W~T BORES ALLOWED!