Freeport NIP(2.3)-CS 960410COPPELL ENGINeeRING
DATE:
TO:
FRO~q:
April 10, 1996
Mike Martin, Assistant City Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for Ouill-440 Royal Lane
The following fees should be assessed and collected on the
referenced project.
WeterImpa~tFee:
~ - 3" 8 E$U's
~ - 3" 8 E$U's
~ - ~" 2.5 ESU's
Total 18.5 ESU's @ $450.00 ea = ~
100% due prior to Council approval of the final plat.
Domestic Meter/s = .
Irrigation Meter/s =__
Fireline Meter/s =
above
WamtewatarImpect
- 3# Domestic Meter/s = 8 ESU's
Total ~ ESU's ~ $450.00 ea = $3.600.Q0
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections ~ $50.00 each = $100.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections @ $50.00 each = $50.00
100% due prior to issuance of building permit. (Residential only)
(RE-INSPECTIONSFOR W~TEROR WAgT~ATER$30.O0)
Development Fees
Page 2
.Utility Final Inspection Fee (Ail Development)
~ lots ~ _~~ = S50.00
100% due prior to issuance of building permit.
Water HeterFee (Domestic)
J ~ - 3# Domestic Meters ~ S195.9~
= S195.98
100% due prior to issuance of building Permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Heter Fee (Irrigation/Fireline)
~i - ~ Irrigation Meter/s @ ~ = ~
~ - ~# Fireline Meter/s @ $~_~_~_a_ = ~
Total _~~
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Fa~ily or Hon-Remidential)
~ Meters @_~_~_~_~ = $30.0~
100% due prior to issuance of water meters.
Irrigation Meter Deposit
~ ~ Meters ~ ~ = $35.00
100% due prior to issuance of water meters.
devfees