Loading...
Freeport NIP(2.3)-CS 960410COPPELL ENGINeeRING DATE: TO: FRO~q: April 10, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Ouill-440 Royal Lane The following fees should be assessed and collected on the referenced project. WeterImpa~tFee: ~ - 3" 8 E$U's ~ - 3" 8 E$U's ~ - ~" 2.5 ESU's Total 18.5 ESU's @ $450.00 ea = ~ 100% due prior to Council approval of the final plat. Domestic Meter/s = . Irrigation Meter/s =__ Fireline Meter/s = above WamtewatarImpect - 3# Domestic Meter/s = 8 ESU's Total ~ ESU's ~ $450.00 ea = $3.600.Q0 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $50.00 each = $100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections @ $50.00 each = $50.00 100% due prior to issuance of building permit. (Residential only) (RE-INSPECTIONSFOR W~TEROR WAgT~ATER$30.O0) Development Fees Page 2 .Utility Final Inspection Fee (Ail Development) ~ lots ~ _~~ = S50.00 100% due prior to issuance of building permit. Water HeterFee (Domestic) J ~ - 3# Domestic Meters ~ S195.9~ = S195.98 100% due prior to issuance of building Permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Heter Fee (Irrigation/Fireline) ~i - ~ Irrigation Meter/s @ ~ = ~ ~ - ~# Fireline Meter/s @ $~_~_~_a_ = ~ Total _~~ 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Fa~ily or Hon-Remidential) ~ Meters @_~_~_~_~ = $30.0~ 100% due prior to issuance of water meters. Irrigation Meter Deposit ~ ~ Meters ~ ~ = $35.00 100% due prior to issuance of water meters. devfees