Loading...
Freeport NIP(2.3)-CS 960612 NAME: ENGINEER: Quill Corporation-Lot 3C, Freeport North ' "Micheel Peeples 6/12/96 SENT ASSESSMENT Park Fee 4/19/96 Water Impact Fee $8,325.00 4/19/96 Wastewster Impact Fee $3,600.00 4/19/96 * Street Sign Street Light Construction Insp.(Grading) Construction Insl~ection Irrigation Street Escrow ($46,746.00) Overtime Inspection Water Tap Inspection Fee Sewer Tap Inspection Fee Utility Final Inspection W. Meter Fee (Domestic) W. Meter Deposit(non-res.) W. Meter Fee ( Irrig &Rre) Irrigation Meter Deposit TOTALS ASSESSED FEE AMOUNT PAID DATE $8,325.00 5/6/96 $3,600.00 516/96 nctifystreetdept. $4,000.00 $4,000.00 $9,467.00 $9,467.00 $11,686.50 $11,686.50 $100,00 $50.00 $50.00 $195.98 $30.00 $5,357.78 $35.00 Total Fees $42,897.26 3/15~96 5/3/96 5/7/96 _...~ 5~6/96 5/6/96 5/6/96  .98 5/6/96 · 00 5/6/96 .78 5/6/96 -'"' S35.00 Fees Paid $42,897.26 $0.00 N/grading 3/15/96 5/6/96 NOTES See letter dated May 7, 1996 from Emerson Partners & correspondence dated February 5, 1996 from Jim Witt (attstched). Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Conet. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To F'mai Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Ero!ion Control