Freeport NIP(7.6)-CS011205 (2) MF. MORANDUM
FROM ~
DEPARTMF. NT OF PUBLIC WORKS
To~
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Larry Morton, Streets Division Public Works
December 5, 2001
W~!k-thru Freeport Parkway Reconstruction 1214101
DRAINAGE
1. O.K.
PAVING
2.
3.
4.
5.
Rom and seal all random cracks.
Clean and ~l mud pocket holes with seolant.
Clean and f'dl joints at median at Gateway.
Take bags off speed limit signs.
Clean and seal joints in curb.
CITY OF COPPELL PUBLIC WOI~S DEPARTMENT
MESSAGE
CONF I RMAT I ON
ID=CITY OF COPPELL
DATE
12Y~5
S,R-TIME
BS' 41"
DISTP~iT STATION ID MODE PAGES RSSULT
~'~2 ~4 ~1 CALLING