Loading...
Freeport NIP(7.6)-CS001031 (2)DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIG NAT ON DATE: SENT ASSESSMENT Park Fee 6/15/01 Water Impact Fee Wastewater Impact Fee Street Sign Street Light 2%*4% Construction Inspection 2% early grading Roadway Impact-Zone Street Cut Permit 2/3/01 2/12/01 3/19/01 3/26/01 4/2/01 4/9/01 ~/15/01 ~/15/01 6/15/01 Overtime Inspection Overtime inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Duke Weeks 140+Acres (Freeport Ext. between Bethel & Ruby) 10/31/00 ASSESSED FEE AMOUNT PAID DATE $7,200.00 noti~ streetdept. $74,138.58 $74,138,58 12/21/00 $20.00 $20,00 10/31/00 $240.00 $240.00 2/23/01 $120.00 $120.00 2/28/01 $120.00 $120.00 3/27/01 $60.00 $60.00 4/10/01 $60.00 $60.00 5/15/01 $120.00 $120.00 5/15/01 $100.00 $100.00 6/20/01 $o.oo $o.oo $o.oo $o.oo $378.74 $378.74 6/20/01 $60.00 $60.0O 6/20/01 $0,00 $0.00 TotalFees Fees Paid Amount Owed $82,617.32 $75,417.32 $7,200.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.