Freeport NIP(7.6)-CS001031 (2)DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIG NAT ON DATE:
SENT ASSESSMENT
Park Fee
6/15/01 Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
2%*4%
Construction Inspection
2% early grading
Roadway Impact-Zone
Street Cut Permit
2/3/01
2/12/01
3/19/01
3/26/01
4/2/01
4/9/01
~/15/01
~/15/01
6/15/01
Overtime Inspection
Overtime inspection
Overtime Inspection
Overtime Inspection
Overtime Inspection
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
Duke Weeks 140+Acres (Freeport Ext. between Bethel & Ruby)
10/31/00
ASSESSED FEE AMOUNT PAID DATE
$7,200.00
noti~ streetdept.
$74,138.58 $74,138,58 12/21/00
$20.00 $20,00 10/31/00
$240.00 $240.00 2/23/01
$120.00 $120.00 2/28/01
$120.00 $120.00 3/27/01
$60.00 $60.00 4/10/01
$60.00 $60.00 5/15/01
$120.00 $120.00 5/15/01
$100.00 $100.00 6/20/01
$o.oo $o.oo
$o.oo $o.oo
$378.74 $378.74 6/20/01
$60.00 $60.0O 6/20/01
$0,00 $0.00
TotalFees Fees Paid Amount Owed
$82,617.32 $75,417.32 $7,200.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.