ST9802-CS 990303The City With A Beautiful Future
PO BOX 478
COPPELL, TEXAS 75019
P.O. Box 478
Coppell, Texas 75019
972-462-0022
March 3, 1999
Robert MeCann
Catellus Development Company
4545 Fuller Drive, Suite 100
Irving, TX 75038
RE: Landscaping P.I.D. Project
Development Fee Assessment
Dear Mr. McCann:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $2,695.60 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need t~o be paid prior to Council approval. Please refer to
the attached table for additional fees. Also provide a copy of the Engineer's estimate or
contract to our office so the conslxucfiun inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
Michael ^. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Landscaping P. LD. Project
Date: 3/3/~9
TOTAL
FEES DUE
Water Impact Fee $2,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $285.60
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100 % due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee $0.00
(100% due prior to Acceptance of Project
Street Sign Fee $0.00
(100% due prior to Acceptance of Project
Construction Inspection Fee $0.00
tOTAL $2,695.60
DEVELOPMENT FEE WORKSHEET
PROJECT: l.m~capi#g P. LD. Project
DATE: 3/3/99
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
2 - 1 1/2 inch = 5 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
'(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: 2 Irrigation Meter(s) @ $142.80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of watar meters)
Irrigatioa/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea,
(100% due prior to issuance of watar meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
0
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
$2,250.00
$100.00
$0.00
$285.60
$o.oo
$0.00
$0.00
$60.00
$0.00
$0.00
$0.00