Loading...
ST9802-CS 990303The City With A Beautiful Future PO BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 March 3, 1999 Robert MeCann Catellus Development Company 4545 Fuller Drive, Suite 100 Irving, TX 75038 RE: Landscaping P.I.D. Project Development Fee Assessment Dear Mr. McCann: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $2,695.60 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need t~o be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the conslxucfiun inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael ^. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Landscaping P. LD. Project Date: 3/3/~9 TOTAL FEES DUE Water Impact Fee $2,250.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $285.60 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee $0.00 (100% due prior to Acceptance of Project Street Sign Fee $0.00 (100% due prior to Acceptance of Project Construction Inspection Fee $0.00 tOTAL $2,695.60 DEVELOPMENT FEE WORKSHEET PROJECT: l.m~capi#g P. LD. Project DATE: 3/3/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 2 - 1 1/2 inch = 5 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 '(Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 2 Irrigation Meter(s) @ $142.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of watar meters) Irrigatioa/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea, (100% due prior to issuance of watar meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $2,250.00 $100.00 $0.00 $285.60 $o.oo $0.00 $0.00 $60.00 $0.00 $0.00 $0.00