Loading...
Freeport NIP(7.6)-CS010615~ENT BY: CTTY Or' C0PPELL; §72 304 704t; ~LU~N-15-01 2:37Piti; PAGE DEVELOPMENT FEE WORKSHEET PROJECT: Freej~o;t Ariemy F~rte~slon (~th~l Rd. re Ruby DATE: 6/15/01 Water Impact Fee: Domestic Meter(s): I~lgation Meter(s): Flmline Meter(s): 0 = 0 ESU'a 2 - 2 inch · 16 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: t6 ESU's ~} S450.00 ea, (100% duo prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections ~ $50,00 on, '(Single family due prior to i~suaflce of t)uilding permit) (Ail offer developments duo prior to issuance of meter) Domestic Water ~[eter Fee: , Total #: 0 Domestic Meter(s) O $0.00 (Single family clue prior lo issuance of building permit) (Ail Other developments due prior to issuance of meter) lrrigation/Fireline Water Meter To~ #: 2 Irrigation Meter(s) O S189.37 _ Total #: 0 Additional Irrigation Meter(s) O S0.00 Total #: 0 Fireline Mater(s) O S0,0~, (100% due prior to Issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Me~'(s) ~ $35.50 ea. (100% due prior to issuance of water molars) lrrization/Flre Meter Deposit Fee: Total #: 2 Meter(s) ~ $30.00 ca, (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: ~ ~4~.00 ea. Wastewater Tap laspection Fcc: Total ~ 0 Connections ~ LS0.00 ea. (100% due prior to Issuance of building permit) Utility Ffnal Inspection Fee (All developments): Total #: 0 Lots O $50.00 ea. (100% due p~r to issuance of I~ilding permit) S100.00 $378.~ ~.00 $0.00 $0.00 Page t g72 304 704t; J1.1.~-t5-0t 2:G7P~; PAGE ~ENT BY: CZTY OF COPPELL; ~ DEVELOPMENT FEE TABLE Project: Freeport Parkway Ertension (Bethel Rd. to Ruby Rd.) Date: 61151Ol TOTAL FEES DUE , $?,2oo.OO I Water Impact Fee (100% due prior to Council Approval,) Water Tap Inspection Fcc $100.00 (100% duc at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100~ due at lssuanc~ of W~Ucr Meter) .. [Water Meter Fee (Irrigation/Fireline) $378.74 (100% due at Issuance of Water Meter) i Water Meter D~posit (Domestic) $0.~0 (lOO%..d.u.e at Issuanc~ of Water Meter) i"Irrigation/Fireline Meter Deposit $60.00 (.100% due at Issuan~ of Wate~ Meter) wastewater Impact Fee (100 % duc prior to Council Approval) Wastewater Tap Inspection Fee $0.0~) (I00% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $0.00 (I00% due at Issuance of Buildintg Perm!}) Park Fee $0.00 (100% due prior to Council Approva.!) Roadway Impact Fee $0.00 (100% due prior to Council Approval) S~reet Light Fee N/A (10~. % due prior to Acceptance of Project Street Sign Fee N/A (100!~ duc prior to Acc~tance of Project Construction Inspection Fee N'/A TOTAL $7,738.74