DEVELOPMENT FEE WORKSHEET
PROJECT: Freej~o;t Ariemy F~rte~slon (~th~l Rd. re Ruby
DATE: 6/15/01
Water Impact Fee:
Domestic Meter(s):
I~lgation Meter(s):
Flmline Meter(s):
0 = 0 ESU'a
2 - 2 inch · 16 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: t6 ESU's ~} S450.00 ea,
(100% duo prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections ~ $50,00 on,
'(Single family due prior to i~suaflce of t)uilding permit)
(Ail offer developments duo prior to issuance of meter)
Domestic Water ~[eter Fee: ,
Total #: 0 Domestic Meter(s) O $0.00
(Single family clue prior lo issuance of building permit)
(Ail Other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter
To~ #: 2 Irrigation Meter(s) O S189.37
_ Total #: 0 Additional Irrigation Meter(s) O S0.00
Total #: 0 Fireline Mater(s) O S0,0~,
(100% due prior to Issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Me~'(s) ~ $35.50 ea.
(100% due prior to issuance of water molars)
lrrization/Flre Meter Deposit Fee:
Total #: 2 Meter(s) ~ $30.00 ca,
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
~ ~4~.00 ea.
Wastewater Tap laspection Fcc:
Total ~ 0 Connections ~ LS0.00 ea.
(100% due prior to Issuance of building permit)
Utility Ffnal Inspection Fee (All developments):
Total #: 0 Lots O $50.00 ea.
(100% due p~r to issuance of I~ilding permit)
S100.00
$378.~
~.00
$0.00
$0.00
Page t
g72 304 704t; J1.1.~-t5-0t 2:G7P~; PAGE
~ENT BY: CZTY OF COPPELL; ~
DEVELOPMENT FEE TABLE
Project: Freeport Parkway Ertension (Bethel Rd. to Ruby Rd.)
Date: 61151Ol
TOTAL
FEES DUE
, $?,2oo.OO I
Water Impact Fee
(100% due prior to Council Approval,)
Water Tap Inspection Fcc $100.00
(100% duc at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100~ due at lssuanc~ of W~Ucr Meter) ..
[Water Meter Fee (Irrigation/Fireline) $378.74
(100% due at Issuance of Water Meter)
i Water Meter D~posit (Domestic) $0.~0
(lOO%..d.u.e at Issuanc~ of Water Meter)
i"Irrigation/Fireline Meter Deposit $60.00
(.100% due at Issuan~ of Wate~ Meter)
wastewater Impact Fee
(100 % duc prior to Council Approval)
Wastewater Tap Inspection Fee $0.0~)
(I00% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $0.00
(I00% due at Issuance of Buildintg Perm!})
Park Fee $0.00
(100% due prior to Council Approva.!)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
S~reet Light Fee N/A
(10~. % due prior to Acceptance of Project
Street Sign Fee N/A
(100!~ duc prior to Acc~tance of Project
Construction Inspection Fee N'/A
TOTAL $7,738.74