Loading...
ST9301A-CS 950410 (2) CITY OF DALLAS' April 10 1995 ~O Flood Plain/CDC Administrator Attn: Ken M. Griffin, P.E. City of Coppell P.O. Box 478 Coppell, Texas 75019 NOTICE OF INTENT TO PROCESS CDC Application Tracking Code CDC 95'01 Dear Mr. Griffin: Enclosed please find Corridor Development permit information for a proposed development activity in the Trinity River Corridor of the City of Dallas. Please review the information provided. Should you decide to comment, please do so within thirty days of receipt of this correspondence in adherence to the Corridor Development Certificate Manual and Process. If you have any questions regarding the information provided, please call me at (214) 948-4681. Thank you for your cooperation and continued participation in this important regional effort. Sincerely, So~ph~ia ~~iadou i'~ ~ P.E. Project Manager Flood Plain Management and Erosion Control Public Works and Transportation Department SI/lhs/TS1553/L~ Enclosure cc: North Central Texas Council of Governments U.S. Army Corps of Engineers, Fort Worth District, Permits Section Federal Emergency Management Agency, Region VI Texas Natural Resource Conservation Commission DEPARTMENT OF PUBLIC WORKS OAK CLIFF MUNICIPAL CENTER 320 E. JEFFERSON BOULEVARD DALLAS, TEXAS 75203 TELEPHONE 214/948-4200 FAX 214/948-4239 Corridor Development Certificate August 1991 General. This application should be completed according to the guidelines set fotOt in the Corridor Development Certificate M~nual. Information provided by the Applicant herein will be used by the City/County to evaluate this Trinity River Corridor Development Certificate (CDC'). This application is public infonnalion and will be used by other re. levant flood plain regulatory authorities, Lc., U.S. Army Corps of Pmgincers (COE); Federal Emergency Management Agency (FEMA); and the Texas Water Commission (TWC). These and other regulatory agencies may require additional infotmatiom If additional space is needed to complete this application, please aztach a separate sheet labeled appropriately. Distribution. If a Notice of Intent to Process is granted, this data shall be distributed to the following agencies: COE. FEMA, TWC; the North Central Texas Counc~ of Governments (NC"FCOG); the cities of Arlington' Ca~rollton. CoppeJ1. Dallas. Farmers Branch, Fort Wcnth. Grand Prairie, bring, and Lewisville; the counties of Dallas. Denton and Tarrant; the Tarrant County Water Control and Improvement District Number One, and the Trinity River Authority. Appllcanrs Representative. (identify person knowledgeable of and authorized to respond to questions concerning data provided by the Applicant) Name: C. Jean Hansens p.E.s Halff Assoclates~ Inc. Relationship to Applimnt: Consulting Engineer Address: 8616 Northwest Plaza Drives Dallass Texas 75225 Telephone: (214} 739-0094 (PLEASE TYPE) Standard CDC Form. Part 1 Section A -- CDC Application (To be t'tiled out by Applicant) 1. CDC Applicant: Dallas County City/County: Carrollton~ Dallass CoppeU Property Owner. Cities of Dallas~ CarroUtons CoppeU Engineer: Halff Associatest Inc. Project Name: Sandy Lake Road Project Size: (total acres)=- Sandy Lake Rd. embankment 30 acr~ NCTCOG Map Grid: McL, mish Park (swale/pond) 35 acres 2. Location: a. Provide general description of location, including MAPSCO location, sheet address, and identified impacted water bodies: Mapsco page lB and 2i 1800 thru 2300 blocks of Sandy Lake Roads Cities of Carrolltmh Coppells and Dalla~_ Impacted water ,Body: Elm Fork - Trinity River. b-L Part or all of project is within the CDC REGULATORY ZONE. aa Yes ra No b.iL Part or all of project is within the CDC REVIEW ZONE. I~ Yes 0 No If the answer to beth of these questions is negative, NO CDC PERMIT is required. 3. Proposed Activity: (check appropriate eategofies) I:1 dredge/channel moctffication ~ swale construction ~ fill [] levee [] other (attach explanation) for road embankment 4. Proposed Use: (cheek appropriate categories) 0 private single dwelling(s) ra private multi-dwelling(s) sa public [] commercial [] industrial n other (explain) Fill for road embankment with compensating swale excavation 5. Applicant requests a variance to common permit criteria. O Yes I! No (Please attach suppozfing material) Application is hereby mad~ for a Corridor Development Certificate (CDC). I certify that I am familiar with lhe information contained in this application, and that to the best of my ' ' .... te and accurate. _ Allen Bud Beene, P.E., Dallas County, Director of Public Works Date CDC Pa~t I -Continuc. d Section B -- Notice of Intent to Process by City/Co.9.~ '] (To be filled out by CDC/Floodplain Administiator) l. CDCNumber: C ~NC q.~-Ol Local Contact Pcrson: LSOf'IqlA IklPtBOO , P.Ik -~ City/~unt~of: bfiLLfiq Telephone Number: (~lt4) qt4~-q4'~ I ' 2. Exempt Category: {cheek if applicable - additional documentation may be required) tl maintenance/repair of Hood control streetures [] bank stabilization activities [] ouffall/intake structure permitted under NPDES program [] project is completely outside the CDC Regulatory Zone · i [] discharge of material for backfill or bedding for utility lines with no change to bottom contours , 3. Required State/Federal Review: ; a. FF-aMA Conditional Leuer of Map Revision (CLOMR) [] Yes [] No b. COB Permit requh-ed [] Yes [] No c. TWC Plan of Reclamation required [] Yes su No 4. COE llydmlogic/llydrauHc technical review completed. (dzeck one) El Yes (attached) --laklqo (explain) /"d [/~ 5. Adnfinistrative Findings: (comments/conditions).. 6. City Action ii' Variance is requested. [] granted [] denied [~ f~/I/~ 7. No6ce of Intent: (check one) ~/~ssued [] denied [] not applicable (CDC not required) By my authority under the City/County, I hcreb)! issue and record the City/County's findings. This Notice of Intent to Process in no way implies that final project will Sigfia~tuh of ClJC/Hoodpia'~m/)k/dministrator/Typed Name/Title Date Oz-] ~Og - q ~- Section C -- CDC Action/Findings '(To be f'dled out by CDC/Fioodp]Mn Administrator) I. Listing of Commentaries: (written comments on ~ application were received from:) 2. Summary of Other Permitting Actions: COE Project No: Permit Type: [] issued [] issued w/conditions [] denied E! no permit required (comments:) FEMA Comments: ' TWC Comments: 3. CDC Action: (check one) rm granted [] granted w/conditions ia denied 4. Operation and Maintenan~ Agreement: [] executed (attach copy) 13 not applicable Date/initials: 5. The CDC will cease to be in effect: [] five years after the date of issuance ff no development activities are undertaken ~ DATE: 6. Final F'mdings of Fact: (summmy of City/Cematy's findings/comments/conditions) By my authority under the City/County. I hereby issue the City/County's findings and final action. Signature of CDC/Floodplain Administrator/Typed Name/Title Date PROJECT: Sandy Lake Road CDC APPIflCANT: Dallas County RIVER: Ehn Fo~k - Trinity River CDC NUMBER: ~ Slandard CDC Form - Part 2 Detailed Hydvologic/IIydraulic Iiffonnafion General. CDC Applicants are requested to provide the following detailed hydrologic and hydrnulie information for all proposed projecc~ wiflfin the CDC Regulatcny Zone of the Trinity River Corridor. This form and the data provided by the Applicant herein is a requited supplement to the Pan 1, Corridor Development Certificate (CDC) Application. However, in catmin cases the City/County may release the Applicant from completing nil or portions of this form ff the proposed project sathfies specific provisions. The Applicant is encouraged to schedule a pr~-application meeting with the City/Cxmnty ff there are any questions regarding the requiremenu o~ the City/County. This application is considered public information and will be distributed to aIfeeted Federal, Stale, and local govemmenufl agencies. Hease be as complete and concise ns possible. ('Fo be riffled out by Applieaua) 1. Site Plan. (a) Please attach a location map (8 I/2 x II). Plans attached: [] Yes [] No (b) Please attach a general site plan (8 I/2 x 11). Plans attached: ss Yes [] No (e) Please attach a detailed site plan (see CDC Manual). ss Yes [] No 2. ttydrolegic/Hydraulic In[ormation. Please provide the follewin§ ~ta to ch~"~ctcrlze the hydrologic and hydraulic impact~ o[ the p~ed lxejecu - 100 YEAR FI.OOD EVENT - * Hydrologic/Hydraulic Impact (mensure) Pm-Project Post-Project Change Discharges: Upsueam Boundary: 99420 55000 cfa. N/A N/A Downsue. am Boundary: 88160 55000 ds. N/A N/A Channel Velocities: Upstream Boundary: 99420 2.29 fps. 2.51 fps. +0.22 fps. Downsueam Boundary: 88160 9.07 fps. 9.07 fps. 0.00 fps. Water Surface Elevation (NVGD): Upstream Boundary: 99420 448.35 ft. 448.13 ft. -0.22 fc Downstream Bonndary: 88160 441.71 ft. 441.71 ft. 0.00 ft. Project Lands in Floodplain:~ 1765 ac. 1742 ac. -23 ac. Valley Storage on Project Lands:~ ac-ft, ac-ft, ac-ft. --SPF FLOOD EVENT - * Hydrologic/Hydraulic Impact (measure) Pre-Project Post-Project Change ~ Discharges: Upsuv. am Boundary: 99420 100,000 ds. N/A N/A Downstream Boundary: ~8160 100,000 ds. N/A N/A Channel Velocities: Upstream Boundary: 99420 2.60 fps. 2.55 fps. -0.02 fps. Downstream Bonndary: 88160 9.09 fps. 9.09 fps. 0.00 fps. Water Sudace Elevation (NVGD): Upstream Boundary: 99420 452.29 ft. 452.35 ft. +0.06 ft. Downstream Boundary: 88160 448.60 ft. 448.60 ft. 0.00 ft. Project Lands in Floodplain:~ 2360 ac. 2350 ac. -10 ac. Valley Storage on Project Lands:~ ac-fo ac-ft, ac-ft. See Section IV of this report for Water Surface FJevation Comparisons Sandy Lake Road Embankment only used for comparison. Acreage based on flood plain from Section 88160 upstream of Belt Line Road through Section 99420. See Attachment for description of valley storage calculation procedure. Corridor Development Certificate Ehn Fork - Trinity River Sandy Lake Road Hydraulic Study Valley Storage Cmnparison The Elm Fork flood plain is partially urbanized through the reach from Belt Line through Sandy Lake Roads. For existing conditions, flow is restricted to four main passages: two routes within the east overbank, the main channel and the left overbank. Non-effective flow areas were modelled utilizing ET cards for encroachments and GR cards to block out non-effective flow within the flood plain. These non-effective flow areas are not included in the water surface elevation calculations, however, should be included for valley storage computations. For proposed conditions the flow area is confined to west of the City of Carrollton landfill. Since a hydraulic model reflecting the full area for valley storage computations is not available, Halff Associates prepared an earthwork model reflecting cut and f'fll for the Sandy lake Road embankment and the proposed swale excavatiori. These quantities are shown in the table below. Sandy Lake Road Bridge Hydraulic Study Valley Storage Comparisons Description 100-Year [ SPF Sandy Lake Road Fill 110,261 cy 184,755 cy Embankment Swale Excavation to Cut 317,011 cy 317,011 cy Normal Pool 430.0 CDC I'ART 2 - CON'I1NUED 3. Flood StoragedIlydraulic Mitigation. Please identify all flood storage and other hydrologic/hydraulic mitigation areas on the site plan, and describe them ~n thc space below. The Flood Storage/Hydraulic mitigation includes a Linear swale, approximately 3600 feet long and a shallow excavated area near Beh Line Road. .The proposed bdd~e is 1040 feet long spanning the main channel and a po~on of the left ove~bank. -~'~ 4. Ilabltat/Wetiand Mitigation. Please identify all habitat and/or Izmd n:so~rce area used for enviroranental mitigation puq~osea on the site plan. and describe them ~ in the apace be. low: " This project has been submilted to the COIl for confirmation of the Wetlands Dctemfination {see Appendix A). , 5. Operation and Maintenance. The operation and maintenance of flood water conveyance systems, conveyance nlterations, storm water control stroemres, equipment ~ and appurtenances, and water quality control measures will become the obligation of: (check one) - [] City [] County [] Owner [] other (specify):  City of Carrollton Parks Department The armualized cost, including ~placement costs, of operating and maintaining post-project storm water control systeans, conveyance alterations, and water quafity control measures is estimated to b~ in cur~nt year dolinrs: ($/yr) .~ 6. Erosion Control Information. Please provide the foH6wing data on site erosion control and water quality protection practices. (1) Construction Controls: (describe construction control strategies intended for site erosion control) -=~ control plan will be included in the construction plans. A _~,. (2) Post Construction Controls: (describe permanent control strategies intended for erosion control and water quality protection after project completion) Concrete Slope paving under the bridge; rip-rap in are~ with velocities > 5 fps; Grass in all other nr~as. 7. Land Cover Information. Please provide the following data, in total acres, to charnctefize the impacts on curtont land cover which will result from construction of the proposed project: - LAND COVER INFORMATION - Values in TOTAL ACRES , Land Use/Land Covet Classification** Pre-Project Post-Project 100 urban/built-up 216.08 ac 225.28 ac "~ 200 a§dculmral/pasmm (park) 160.14 ac 135.95 ac 300 rangeland/shmb & brash (other) 336.06 ac 328;82 ac -'=~ 400 for~st/wcodlands 65.05 ac 63.93 ac 500 water (identify on site plan) 206.99 ac 231.09 ac I 600 wetland (identify on site plan) (modified only)' 0.81 ac ' 0.06 ac 700 bar~-a land/mines & quarries 0andf'dl) 116.87 ac 116.87 ac ~ **Note: Listed land cover types are "l.~vel 1" ca~egor~s (100 thru 700) &fined in accordance with th~ land me and land cover class~catlon of~ht U.S. Geological Survey, U.S. Department of th~ Interior. This data may be required by th~ U.S. Army Corps of Engineers and other regulatory agencies. To the be~t of my knowledge, the information in Part 2 i~ complete and accurate: _ Allen Bud Beene, P.E., Dallas County, Director of Public~c"Works Date