Loading...
Gateway BP(1.2)-CS 970317 COPPF. I.L EI~GIN~ERING UTILITIF3 DIVISION MEMORANDUM DATE: 3/17/97 TO: Larry Davis, Construc~on Inspector FROM: Larry Smith, Utilities RE: Walk thru for Fritz/Gatewa Bn~ifl~ Park A walk-thru on the above refeanmced project was conducted on and the items below were found to be deficient. 1. 3/17/97 1~ _~ir Bflcolid on do~o-~tie meter vault on C',~teway will not ot~en fully. 10. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg COPPer ~. ENGII~EER1NG ~I~ITI]~ DIVISION M]~MORANDUM · 03/03/97 ~8:30 CITY ~ COPPELL ENGINEERING -+ CITY Of CC~'~ELL NO. 360 ~01 To; DaM: Mike Martin, E.I.T., Azst. City Engineer Matt Cast, Superintendent of Public Services Travis Cramp, Acting Fire Marshal GreE lon~$, Ch/el B,ilding Off',¢ial ~;~p~ I,m'y Davis, Construction Inspector WALK-TItRU for Fritz / Gateway Business Park March 3, 1997 A walk-thru for the referenced project has been scheduled for Tuesday, March 4, 1997 at 1:30 p.m. If I can be of furlher assistance please let me know. cc: Haws & Tingle / FAX (817)927-8.586 flle/ldavis/OwaJkthnJ, mm