Gateway BP(1.2)-CS 960801DEVELOPMENT FEES
IECT NAME: Gateway Business Park, Lot 1, Block I (Fritz Warehouse)
INEER: Brocketter, Davis, and Drake
;ION DATE: 8/1/96
SENT ASSESSMENT
Park Fee
ASSESSED FEE
4/19/96 Water Impact Fee $19,125.00
4/19/96 Wastewater Impact Fee $10,800.00
Street Sign
Street Light
Const. Inspection (Public)
Const. Inspection (Private)
irrigation
$4,765.74
$15,425.24
4/19/96 Street Escrow $53,898.14
Street Cut Permit $100.00
Overdme Inspection
Water Tap Inspection
Sewer Tap Inspection
Utility Final Inspection
Water Meter (Domestic)
Water Meter Deposit
Water Meter (Fire & Irrig.)
Irrigation Meter Deposit
TOTALS
$350.00
$200.00
$50.00
$1,637.94
$150.0O
$9,190.98
$70.00
Total Fees
$115,763.04
AMOUNT PAID
$19,125.00
$10,800.00
notify streetdept.
$4,765.74
$15,425.24
$53,898.14
$100.00
$350.00
$200.00
$50.00
$1,637.94
$150.00
$9,190.98
$70.00
Fees Paid
$115,763.04
DATE
5/10/96
5/23/96
5/10/96
5/10/96
5/23196
6/5196
5/10/96
5/10/96
6120/96
5/10196
6120/96
6/20/96
Amount Owed
$0.0C
NOTES
5113196
4~5~6
Prior To Construction
Erosion Control Approved (w/grading plans)
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Homeowner's Maint.
Prior To F'msi Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.