Loading...
Gateway BP(1.2)-CS 960801DEVELOPMENT FEES IECT NAME: Gateway Business Park, Lot 1, Block I (Fritz Warehouse) INEER: Brocketter, Davis, and Drake ;ION DATE: 8/1/96 SENT ASSESSMENT Park Fee ASSESSED FEE 4/19/96 Water Impact Fee $19,125.00 4/19/96 Wastewater Impact Fee $10,800.00 Street Sign Street Light Const. Inspection (Public) Const. Inspection (Private) irrigation $4,765.74 $15,425.24 4/19/96 Street Escrow $53,898.14 Street Cut Permit $100.00 Overdme Inspection Water Tap Inspection Sewer Tap Inspection Utility Final Inspection Water Meter (Domestic) Water Meter Deposit Water Meter (Fire & Irrig.) Irrigation Meter Deposit TOTALS $350.00 $200.00 $50.00 $1,637.94 $150.0O $9,190.98 $70.00 Total Fees $115,763.04 AMOUNT PAID $19,125.00 $10,800.00 notify streetdept. $4,765.74 $15,425.24 $53,898.14 $100.00 $350.00 $200.00 $50.00 $1,637.94 $150.00 $9,190.98 $70.00 Fees Paid $115,763.04 DATE 5/10/96 5/23/96 5/10/96 5/10/96 5/23196 6/5196 5/10/96 5/10/96 6120/96 5/10196 6120/96 6/20/96 Amount Owed $0.0C NOTES 5113196 4~5~6 Prior To Construction Erosion Control Approved (w/grading plans) E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To F'msi Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.