Loading...
Gateway BP(1.2)-CS 960731COPPELL ENGXNEER~N~ UTILXTXES DXVXSXON MF.~O~UH DATE: TO: FROM: RE: July 31 1996 Carolyn Bebermeyer, Accountant Matt M. Cast, Superintendent of Public Services Credit To Be Issued On 2" Irrigation Meter Originally this project for Fritz was assessed with (3) 2" meters. Attached is a copy of a receipt showing payment for these meters. They decided they only needed (2) 2" meters and only picked up 2 meters. They asked that we credit them for the amount of $3,875.98 Impact Fee for 2" $3,600.00 2" meter cost $ 195.98 meter inspection $ 50.00 deposit for meter $ 30.00 TOTAL $3,875.98 Check can be mailed to Catellus Development Corporation 1065 N. PacifiCentsr Dr. Suite 200 A~aheim, California 92806 If you have any questions, please give me a call. MMC/dg DEVELOPMENT FEES PROJECT NAME: Gateway Business Park, Lot 1, Block 1 (Fritz Warehouse) ENGINEER: Brocketter, Davis, and Drake REVISION DATE: 8/1/96 SENT ASSESSMENT Park Fee ASSESSED FEE 4/19/96 Water Impact Fee $19,125.00 4/19/96 Wastewater Impact Fee $10,800.00 Street Sign Street Light Const. Inspection (Public) Const. Inspection (Private) Irrigation $4,765.74 $15,425.24 4/19/96 Street Escrow $53,898.14 Street Cut Permit S 100.00 Overtime Inspection Water Tap Inspection Sewer Tap Inspection Utility Final Inspection Water Meter (Domestic) Water Meter Deposit Water Meter (Fire & Irrig.) Irrigation Meter Deposit TOTALS $350,00 $200.00 $50.00 $1,637.94 $150.00 $9,190.98 $70.00 TotalFees $115,763.04 AMOUNT PAID DATE $19,125.00 ~ 5/10/96 $10,800.00 5/23/96 notify street dept. $4,765.74 5/10/96 $15,425.24 5/10/96 $53,898.14 5/23/96 $100.00 6/5/96 $350.00 5/10/96 $200.00 5/10/96 $50.00 6/20/96 $1,637.94 5/10/96 $150,00 6/20/96 $ 9,190.98 6/20/96 $70.00 Fees Paid Amount Owed $115,763.04 $0.00 NOTES 5/13/96 4/25/96 Prior To Construction Erosion Control Approved (w/grading plans) E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. COPP~nn ENGINEERING DATE: TO: FROM: RE: April 12, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Fritz (Gateway) REVISED The following fees referenced project. Water Impact Fee: ~ - fl) 2" fl; 3 - f2) 8" fl; Total 42.5 should be assessed and collected on the above 100% due prior to Council approval 3" Domestic Meter/s = ~4 ESU's Irrigation Meter/s ~ 16 ESU's lO" Fireline Meter/s = 2.5 ESU's ESU's ~ $450.00 ea = S19o125.00~ of the final plat. Wastewater Impact - (I~ 2" Total 24 3" Domestic Meter/s = 24 ESU's ESU's ~ $450.00 ea = $10,800.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 7 Connections ~ $50.00 each = $350.00 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, prior to issuance of meter). Sewer Tap Inspection Fee 4 Connections ~ $50.00 each - $ 200.00 100% due prior to issuance of building permit. (RE-INSPE~TIONFOR WATER OR WAST~ATER $30.00) (Or in fee is due (Residential only) Fees Page 2 Utility Final IxL~pection Fee ~ lots ~ $ 50.00/iot = 10O% due prior to issuance of building permit. (Ail Development) $50. oo Water Heter Pee (Domestic) ~ - 3" ~ - 2" Domestic Meters ~ S1.050.00 = $1.050.00 Domestic Meters ~ S195.98 = S587.94 Total $ 1.637.94 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee ~/ 1 - 10" (Irrigation/Fireline) Irrigation Meter/s ~ $595.98 ea = $ 391.96 Fireline Meter/s ~ $ 2,580.90ea = $5.161.80 Fireline Meters/s ~ S3,637.20ea = $3,637.20 Total $9,190.98 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 5 Meters ~ $30.00 ea = S150.00 100% due prior to issuance of water meters. Irrigation Meter Deposit ~ Meters ~ $35.00 ea = $70.00 100% due prior to issuance of water meters. fritz2 {2IT',' 0F COPPELL ENGINEERiHG ',' ~'14 JU4 j,.b4'r' CATgLgU5 ~ELOPM~NT CORPORATION THOUSAND THREE HUNDRED NINETY DOLLARS AND 98/[00******** 901728 1%3 TH~: OFIOF..R OF C~TY OF COPPELL DATE CHECK AMOUNT 6-18-96 $9,390.98 ':0 :~ ~, 1,00 O0 5 q =. q ~08/01/96 16:4Z CITY OF COPPELL ENGINEERIHG -~ 214 304 354? DEVELOPMENT FEES I0JECT NAME: Gateway Busineu Park, Lot 1, Block 1 (Fritz Warehouse) NGINEER: Brocketter, Davis, and Drake E, VISION DATE: , .~ ... 6120/96 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 4119/96 4/19/96 Water Impact Fee Wastewater Impact Fee $19,125.00 $10.800.00 $19,125.00 $10,800.00 5/10/96 5/23/96 Street Sign 4/19/96 Street Light Const. Inspection (Public} Const. Inspection (Private) Irrigation Street Escrow Street Cut Permit Overtime Inspection Water Tap Inspection Sewer Tap Inspection Utility Final Inspection Water Meter (Domestic) Water Mater Deposit Water Meter (Fire & Irrig.) Irrigation Meter Deposit TOTALS $4,765.74 $15,425.24 $53,898.14 $100.00 9350.00 $200.00 $50.00 $1,637.94 $150.00 $9,190.98 S70.00 TotalFees $115,763.04 notify ~reetdept. $4,765.74 $15,425,24 $53,898.14 $100.00 $350.00 $200.00 $50.00 $1,637.94 $150.00 $9,190.98 $70,00 Fees Paid $115,763.04 5/1 O/96 5/10/96 5/23/96 6/5/96 5/10/96 5/10196 6/20/96 5/10196 6/20/96 6120196 Amount Owed $0.00 5113196 125196 NOTES Prior To ConetflJctlon Erosion Control Approved (w/grading plans) E,P,A,-N.O.I, Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Pflor To Final Acoaptanoe As Built Plan Recd. Paving Bond Rood. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Malnt. Project: Fritz (Gat ay) TOTAL AMOUNT DUE IP~.F~q DUE PRIOR TO COUNCIL AI~ROVAL Water Impact Fee $19,125.00 $19,12~.00 (100% due prior to Council Approval) Water Tap Inspection Fee 350.00 -O- (100% due at Issuance of Water Meter) Waztewater Impact Fee 10,800.00 10,g00.00 (100% due prior to Council ^,p, proval) Sewer Tap Inspection Fee 200.00 -0- Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 1,637.94 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 150.00 -0- (100% due at Issuance of Water Meter~) Water Meter Fee (Irrigation & Fire) 9.190.98 -0- (100% due at Issuance of Water Meters) Irrigation Meter Dcpnsit 70.00 (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee ' information not -O- (100% due prior to Accepta~c,e of Project) available Park Fee -5- -O- Street Escrow 53,891L 14 53,898.14 (100% due prior to Council Approval) Construction Inspection Fe~ need submittal of -0- (2% of Project Cost due prior to Proconstr, Mtg.) contracts TOTAL $ 95,472.06 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 83,823.14 This fee cannot be azsess~d until after TU FAectric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be PAY 08/0:i/96 ;16=44 C~Tr' OF COPPELL ENI3~NEERiNL~ ~ 2.).4 ..:,vJ4 ~,,~4',' HM.=~Jr ~2/)6 PERMIT FEES FRITZ PROJECT I I I I I CATELLU$ DEVELOPMENT CORPORATION 1065 N. PACIFICENTER DRIVE, SUITE 200 AN^HEI~I, C~LIFORNIA ~8~ FORTY ONE THOUSAND FIVE HUNDRED SEVENTY THREE AND 92/100'**'** TO "HE ORDER OF DATE THE CITY OF COPPELL 04/22/96 CHECK AMOUNT $41,573.92 o INVQICEICRi~IT MEMO 5 .~lll 96 600131000-11725.41 '~RMITS (TEXA! 64,698, ;14 CATELLUS DEVELOPMENT CORPORATION 106.5 N. P~ctF~C,,m'z~ DE[vi, SUITE 200 AN~I~EIM. C, nu~o~,,'~iA 92806 PAY *******SIXTY FOUR THOUSAND SIX HUNDRED NINETY EIGHT AND 14/100'********** $0170G OROER OF CITY OF COPPELL DAT~ CH~¢KAMOUNT 5/21/96 $64,698.14 ,'cio I, ?Or-"' O0 5q :~ciSO'l' ITl OF COPPELL ENGINEERING ~ 214 384 3547 NO. 68? Fritz/Catellus/Copp ll Shell Building knowu Fccs as of April 24, 1996 51 t"15 AL~sc.lut~ mi,~imum amotmt ,.i,,hich mt)st b~ paid l),'ior to co~mne,mcmcnt of gratlin§ -- $15,425.24 007465 HLEA~;E 0ETACH THiS PORTION BEFORE DEPOSITING IIIBI~ FORT WORTH, ~ ~6113 COCA'ORS, INC. ~GNOL~ A~,, SU~ ~ FO~ WOR~, ~ 76104 ONE HUNDRED DOLORS AND NO/100 ................................................. HAY ORDER OF OATE 5-31-96 I- L CITY OF COPPELL 255PARKWAY BLVD. "' 0 0 ~ 4 6 S"' ~; & 1, ~.~063 ~3~ 506 ~,,,.,s ? -~1~3 Jc