Loading...
Gateway BP(1.2)-CS 960620~14 3~4 C I TY O~COPPELL ENGINEERING -* SERUICE CE~-IR, NO. 288 I;~_ DEVE.OFMINT F'E~8 Broakltter. Davi~0 a~cl Drake DATE: 4/10/86 4/19/86 4,/19/99 Park Fee Water Impact Fee WIIstewctgr Irnplo! Fee 8treat Sign S~reet ~.i~ht Canlt. Insplotion (Publia) Corm. InK)emion (Private) Irrigation 8tree! Cut Permit Overtime Irtspeution Wa~er Tap Inspection 8ewer Tap Inspe(~on Utility F~n.l In~Pe~n Water Meter (Domestic) WBTM, Me;er Deposit Waiter Meter (Fire & hTig.) irrigation Meter Deposit TOTAL8 0AllE $19,125,00 $19,125.00 5/10/96 0,800.00 $10,800.00 5/23/96 notify street dept. $4,765.74 $4,765,74 5/10/96 15,425.24 ~15,425.24 5/10M ~53,898.14 $53,~98.14 5/23/96 ~ 100.00 I~ 100.00 615/96 $350,00 $360.00 6110/96 t200,O0 ~200.00 6110/96 $60.00 $50.00 6~20/98 t 1,637.94 $1,637,94 5/10/96 ~150.00 6150.00 6/20/96 19,190.98 19,190.98 6/20/96 $70.00 170,00 Total Feea ~ Paid Arno~nr Owed I'11 ~,7;3.04 $11~,7~3.04 5/13/86 4(2s/9~ Erosion Control Approved (w/grading plans) E.P.A,-N.O.J. Recd. ~. ~*n ~rov~ I~oe~On ~an ~d. IMor To ~ Aoeept~ee A~ Built Plan Flood. Paving Bond Ut#i~ee Bond R~od.