Gateway BP(1.2)-CS 960612IPROJECT NAME: Gateway Bueineee Park, Lot 1, Block 1 (Fritz Warehouse)
ENGINEER: Brocketter, Davis, and Drake
REVISION DATE: 6/12/96
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
4/19/96 Water Impaot Fee $19,125.00 $19,125.00 5/10/96
4/19/96 Waeteweter Impact Fee $10,800.00 $10,800.00 5/23/96
Street Sign
Street Light
Const. Inspection (Public)
Const. Inspection (Private)
Irrigation
notify street dept.
$4,765.74 $4,765.74 5/10/96
$15,425.24 $15,425.24 5/10/96
4/19/96 Street Escrow $53,898.14
Street Cut Permit $100.00
Overtime Inspection
Water Tap Inspection
Sewer Tap Inspection
Utility Final Inspection
Water Meter (Domestic)
Water Meter Deposit
Water Meter (Fire & Irrig.)
Irrigation Meter Deposit
TOTALS
$53,898.14 5/23/96
$100.00 6/5/96
$350.00 $350.00 5/10/96
$200.00 $200.00 5/10/96
$50.00
$1,637.94 $1,637.94 5/10/96
$150.00
$9,190.98
$70.00 $70.00
Total Fees Fees Paid Amount Owed
$115,763.04 $106,372.06 $9,390.98
NOTES
5/13/96
4/25/96
Prior To Conatmction
Erosion Control Approved (w/grading plans)
E.P.A.-N.O.I. Recd.
Conet. Plan Approved
Irrigation Plan Recd.
Homeowner's Metnt.
Prior To Final Acceptance
Aa Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.