Loading...
Gateway BP(1.2)-CS 960612 (2)~ t'/' ~"-~0.~ DEVELOPMENT FEES I PROJECT NAME: Gateway Busine~ Park, Lot 1, Block 1 (Fdtz Warehouse) ENGINEER: Brocketter, Davis, and Drake REVISION DATE: 6/12/96 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID Park Fee 4/19/96 Water Impact Fee $19,125.00 $19,125.00 4/19/96 Wsstewater Impact Fee $10,800.00 $10,800.00 Street Sign Street Ught Const. Inspection (Public) Const. Inspection (Private) Irrigation DATE 5/10/96 5/23/96 notify street dept. $4,765.74 $4,765.74 5/10/96 $15,425.24 $15,425.24 5/10/96 $53,898.14 5/23/96 $100.00 6/5/96 $350.00~ $35QJ~0 5/10/96 $200.00/ ~~ 5/10/96 ~ $1,637.94 5/10/96 $150.00~,~ $9,190.98 v/ $70.00 ~ $70.00 Total Fees Fees Paid Amount Owed 15,763.04 $106,372.06 $9,390.98 4/19/96 Street Escrow $53,898.14 Street Cut Permit $100.00 Overtime Inspection Water Tap Inspection Sewer Tap Inspection Utility Final Inspection Water Meter (Domestic) Water Meter Deposit Water Meter (Fire & Irrig.) Irrigation Meter Deposit TOTALS NOTES 5/13/96 4/25/96 Prior To Conetmction Erosion Control Approved (w/grading plans) E.P.A.-N.O.I. Recd. Conat. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.