Gateway BP(1.2)-CS 960612 (2)~ t'/' ~"-~0.~ DEVELOPMENT FEES
I PROJECT NAME: Gateway Busine~ Park, Lot 1, Block 1 (Fdtz Warehouse)
ENGINEER: Brocketter, Davis, and Drake
REVISION DATE: 6/12/96
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID
Park Fee
4/19/96 Water Impact Fee $19,125.00 $19,125.00
4/19/96 Wsstewater Impact Fee $10,800.00 $10,800.00
Street Sign
Street Ught
Const. Inspection (Public)
Const. Inspection (Private)
Irrigation
DATE
5/10/96
5/23/96
notify street dept.
$4,765.74 $4,765.74 5/10/96
$15,425.24 $15,425.24 5/10/96
$53,898.14 5/23/96
$100.00 6/5/96
$350.00~ $35QJ~0 5/10/96
$200.00/ ~~ 5/10/96
~ $1,637.94 5/10/96
$150.00~,~
$9,190.98 v/
$70.00 ~ $70.00
Total Fees Fees Paid Amount Owed
15,763.04 $106,372.06 $9,390.98
4/19/96 Street Escrow $53,898.14
Street Cut Permit $100.00
Overtime Inspection
Water Tap Inspection
Sewer Tap Inspection
Utility Final Inspection
Water Meter (Domestic)
Water Meter Deposit
Water Meter (Fire & Irrig.)
Irrigation Meter Deposit
TOTALS
NOTES
5/13/96
4/25/96
Prior To Conetmction
Erosion Control Approved (w/grading plans)
E.P.A.-N.O.I. Recd.
Conat. Plan Approved
Irrigation Plan Recd.
Homeowner's Maint.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.