Loading...
Gateway BP(1.2)-CS 960419~~he City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 19, 1996 Gromatzk7 Dupree & Association Scott McCrary 2626 Cole Avenue Ste. 100 LB Box 48 Dallas, Texas 75204 RE: Fritz Development Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for_F.I~. Please make payment to the City of Coppell in the amount of $29.925.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any queslions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Fimnce Director Greg lon~, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintmdent Per Birdmll, SU'eet Division Rick Wieland, Parks Development Coordinator CITY OF COPPgJa. DEVF~I OPMENT FEES ~'~ April 19, 1996 Fritz (Gateway) TOTAL AMOUNT DUE ~ PRIOR TO COUNCIL Water lm?tgt Fee $19,125.00 $19,125.00 (100~ due prior to Council Approval) Water Tap Inspection Fee 350.00 (100% due at Issuanc~ of Water Meter) Wastowater Impact Fee 10,800.00 10,800.00 (100% due prior to Counoil Approval) Sewer Tap Impection Fee 200.00 (100% due at Issuance of Building Permit) Utility FinAl Impection Fee 50.00 (100% due at Issuance of BuLldln~o Permit) Water Meter Fee (Domestic) 1,637.94 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 150.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 9,190.98 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 70.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50~ due prior to Council Approval) (50~ due prior to Issuance of Building Permit) Street Escrow (100~ due prior to Council Approval) Construction lmpection Fee ~ submittal of (21 of Project Cost due prior to Precomtr. Mtg.) contracts TOTAL $41,573.92 $29,925.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * Thi~f~c~m~b~m~m~u~fi~/~rTUF~u~ubmimth~ighfingp~mf~r~h~pr~p~sedpr~j~ Onc~hopim is submittM, $292.60 per light will b~ asaa~mt. COpp~.T. EHGIN~RING ~E~OR~VflON DA~R : ~0: PROH: April 12, 1996 Hike Hartin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for Fritz (Gateway) REVISED The following fees should be assessed referenced project. Water Impect~ee: - ~Domestic Heter/s Total 100% due prior to Council approval and collected on the above = 24 ESU's Irrigation Meter/s = 16 ESU's {1! 10" Fireline Meter/s = 2.5 ESU's 42.5 ESU's ~ $450.00 ea = ~ of the final plat. WastewaterImpact - fl~ 2" ~1~ 3" Domestic Heter/s = 24 ESU's Total 24 ESU's ~ $450.00 ea = S10.800.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 7 Connections @ $50.00 each = $350.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 4 connections ~ $50.00 each - $ 200.00 100% due prior to issuance of building permit. (RE-I~$PECTIOHFOR WATER OR W~ATER$30.O0) (Residential only) Develol~ment Fees Page 2 Utility Pinal Inmpectio~ Fee (Ail Development) ~ lots ~ $ 50.00/lot ~ S50.00 100% due prior to issuance of building permit. Water Meter Pee (Domestic) i - $" ~ - ~~ Domestic Meters ~ ~ = S1.050.00 Domestic Meters ~ $195.98 = $587.94 Total ~ 100% due prior to issuance of building permit for residential only. A/1 other development fees ere due prior to issuance of meter/s. Water Meter Fee - 10" (Irrigation/Pireline) Irrigation Meter/s ~ S195.98 e4 = S 391.96 Fireline Meter/s ~ $~ = ~ Fireline Meters/s ~ ~= $3,637.20 Total S9,190,98 100% due prior to issuance of water meter/s. Water Meter Deposit (~ulti-Fa~ily or Non-Residential) $ Meters ~ S30.00 ea = S150.00 100% due prior to issuance of water meters. Irrigation Meter Deposit ~ Meters ~ S35.00 ea = S70.00 100% due prior to issuance of water meters. frtts2