Gateway BP(1.2)-CS 960419~~he City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
April 19, 1996
Gromatzk7 Dupree & Association
Scott McCrary
2626 Cole Avenue Ste. 100
LB Box 48
Dallas, Texas 75204
RE: Fritz
Development Fee Assessment
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for_F.I~.
Please make payment to the City of Coppell in the amount of $29.925.00 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any queslions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
Jennifer Armstrong, Fimnce Director
Greg lon~, Building Official
Doug Stevens, Engineering Technician
Ted Dutt, Interim Utilities Superintmdent
Per Birdmll, SU'eet Division
Rick Wieland, Parks Development Coordinator
CITY OF COPPgJa.
DEVF~I OPMENT FEES ~'~
April 19, 1996
Fritz (Gateway)
TOTAL AMOUNT DUE
~ PRIOR TO
COUNCIL
Water lm?tgt Fee $19,125.00 $19,125.00
(100~ due prior to Council Approval)
Water Tap Inspection Fee 350.00
(100% due at Issuanc~ of Water Meter)
Wastowater Impact Fee 10,800.00 10,800.00
(100% due prior to Counoil Approval)
Sewer Tap Impection Fee 200.00
(100% due at Issuance of Building Permit)
Utility FinAl Impection Fee 50.00
(100% due at Issuance of BuLldln~o Permit)
Water Meter Fee (Domestic) 1,637.94
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 150.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 9,190.98
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 70.00
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50~ due prior to Council Approval)
(50~ due prior to Issuance of Building Permit)
Street Escrow
(100~ due prior to Council Approval)
Construction lmpection Fee ~ submittal of
(21 of Project Cost due prior to Precomtr. Mtg.) contracts
TOTAL $41,573.92 $29,925.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
* Thi~f~c~m~b~m~m~u~fi~/~rTUF~u~ubmimth~ighfingp~mf~r~h~pr~p~sedpr~j~ Onc~hopim
is submittM, $292.60 per light will b~ asaa~mt.
COpp~.T. EHGIN~RING
~E~OR~VflON
DA~R :
~0:
PROH:
April 12, 1996
Hike Hartin, Assistant City Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for Fritz (Gateway) REVISED
The following fees should be assessed
referenced project.
Water Impect~ee:
- ~Domestic Heter/s
Total
100% due prior to Council approval
and collected on the above
= 24 ESU's
Irrigation Meter/s = 16 ESU's
{1! 10" Fireline Meter/s = 2.5 ESU's
42.5 ESU's ~ $450.00 ea = ~
of the final plat.
WastewaterImpact
- fl~ 2" ~1~ 3" Domestic Heter/s = 24 ESU's
Total 24 ESU's ~ $450.00 ea = S10.800.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
7 Connections @ $50.00 each = $350.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
4 connections ~ $50.00 each - $ 200.00
100% due prior to issuance of building permit.
(RE-I~$PECTIOHFOR WATER OR W~ATER$30.O0)
(Residential only)
Develol~ment Fees
Page 2
Utility Pinal Inmpectio~ Fee (Ail Development)
~ lots ~ $ 50.00/lot ~ S50.00
100% due prior to issuance of building permit.
Water Meter Pee (Domestic)
i - $"
~ - ~~
Domestic Meters ~ ~ = S1.050.00
Domestic Meters ~ $195.98 = $587.94
Total ~
100% due prior to issuance of building permit for residential only.
A/1 other development fees ere due prior to issuance of meter/s.
Water Meter Fee
- 10"
(Irrigation/Pireline)
Irrigation Meter/s ~ S195.98 e4 = S 391.96
Fireline Meter/s ~ $~ = ~
Fireline Meters/s ~ ~= $3,637.20
Total S9,190,98
100% due prior to issuance of water meter/s.
Water Meter Deposit (~ulti-Fa~ily or Non-Residential)
$ Meters ~ S30.00 ea = S150.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
~ Meters ~ S35.00 ea = S70.00
100% due prior to issuance of water meters.
frtts2