Loading...
Gateway BP(1.2)-CS 960419 (2)April 19, 1996 The City With A Beautiful Future~.r.~[~ f,~ C.&~ n~/./l_.&~r..~ __ PUBLIC WORKS P.O. Box 478 Coppell, Texas 75019 214-462-0022 Scott McCrary Gromatzky Dupree & Associates 2626 Cole Avenue, Suite 100 LB Box 48 Dallas, Texas 75204 RE: Gateway Business Park, Replat of Block 1 (Fritz) Development Fee Asse~ment Dear Mr. McCrary: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for Gateway Business Park Reolat of Block 1 (Fritz). Please make payment to the City of Coppell in the amount of $1~3.823.14 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our depa~hnent so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verifY payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, _please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Finance Dhector Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Street Division Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVELOPMENT FEES Date: .April 19, 1996 Project~ . Fritz (Gateway) TOTAL AMOUNT DUE FEES D~ PRIOR TO COUNCIL Water Impact Fee $19,125.00 $19,125.00 (100% due prior to Council Approval) Water Tap Impection Fee 350.00 -0- (100% due at Issuance of Water Meter) Waztewater Impact Fee 10,800.00 10,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 200.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at hsuance of Building Permit) Water Meter Fee (Domestic) 1,637.94 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 150.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 9,190.98 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 70.00 -0- (100% due at !nsuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Aeg, eptance of Project) Street Light Fee * information not -O- (100% due prior to Acceptance of Project) avallfble Park Fee -0- -O- Street Escrow 53,898.14 $3,898.14 (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Proj~t Cost due prior to Pr~¢onstr. Mtg.) ¢ontra~ts TOTAL $ 95,472.06 $ 83,823.14 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. {)nee the plan is submitted, $292.60 per light will be assessed.