Freeport NIP(7.0)-CS040304COPPE L
March 4, 2004
C. Jack Evans, P.E.
Pacheco Koch
8350N. Central Expwy.
Sui~ 1000
Dallas, TX 75206
RE: Freeport X, Lot 3 Block A(Container Store)
Final Acceptance
Dear Mr. Evans:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
cL;~str~Ddti~ol~l in[spector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
CC:
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Vernon Gilmore, Acting Fire Marshal
Jeff Langston, Duke Construction
Mike Cox, Duke Construction