Loading...
Freeport NIP(7.0)-CS03041004×10/2~3 15:25 CITY OF COPPELL ENGR. DEPT. e SRU CTR N0.414 DO1 From: Da~e: COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING II Memo to Project and Fee Files Teresa Turner, E.I.T., Graduate Engineer' ~ April 10, 2O03 Fbre Meter Correction Duke-Weeks, Freeport X (The Coutainer Store) I Thc fee aseessmcnl fro' the above referenced project incon'cctly charf~d for two-10" fire meters and vaults. Thc approved plans however, specify on~-lO" and one-8" fn~ mete~ and vault. The only amount on the Development Fee Table that will change with thc difference in one of' the meter sizes is the Wat~ Meter Fee (hxigation/Fireline). The odg/nal Wmr Met~ Fcc for two-lO" meters and vaults was $6,431.90. However, reducing the si~e of one of thc met~ ~m~ 8" results h~ a diffca'encc ot~ $918.23. The revised ~d corr~ted Water Meter Fee for this projcot is $5,513.67, which results in a corroct~:l Total I~velopment CO81 of $15,878.95. CC: Jcnmfer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secrela~, Building Inspections Glelm Hollowell, Assist,mt Directo~ of Public Works Grog Jones, Chief Buildit~ Official Bra~ Reid, lmerim Director of Parks aud RecreaOon