Freeport NIP(7.0)-CS03041004×10/2~3 15:25 CITY OF COPPELL ENGR. DEPT. e SRU CTR N0.414 DO1
From:
Da~e:
COPPELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
II
Memo to Project and Fee Files
Teresa Turner, E.I.T., Graduate Engineer' ~
April 10, 2O03
Fbre Meter Correction
Duke-Weeks, Freeport X (The Coutainer Store)
I
Thc fee aseessmcnl fro' the above referenced project incon'cctly charf~d for two-10" fire meters and
vaults. Thc approved plans however, specify on~-lO" and one-8" fn~ mete~ and vault. The only
amount on the Development Fee Table that will change with thc difference in one of' the meter sizes
is the Wat~ Meter Fee (hxigation/Fireline).
The odg/nal Wmr Met~ Fcc for two-lO" meters and vaults was $6,431.90. However, reducing
the si~e of one of thc met~ ~m~ 8" results h~ a diffca'encc ot~ $918.23. The revised ~d corr~ted
Water Meter Fee for this projcot is $5,513.67, which results in a corroct~:l Total I~velopment CO81
of $15,878.95.
CC:
Jcnmfer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secrela~, Building Inspections
Glelm Hollowell, Assist,mt Directo~ of Public Works
Grog Jones, Chief Buildit~ Official
Bra~ Reid, lmerim Director of Parks aud RecreaOon