Loading...
ST9302-CS 990202FAX,(214) 352-3201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 TELEPHONE (214) 358-6581 February 2, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re~ Sandy Lake Road Reconstruction Coppell Project ti: ST 93-02 Kimley-Hom Project #: 06940600 Dear Mr. Griffin: Enclosed for you review is our revised billing on the referenced project through January 31, 1999. This billing includes a request for payment for $26,579.10 worth of material on hand for 16" PVC water line and several sizes of concrete storm sewer pipe that have not been incorporated into the work. These items are currently stored within the project ROW and are available for your inspection. This request for material on hand is a reduction from previous requests and doesn't include any new material items. If you have any questions regarding this billing, please contact our office. Sincerely, Robert D. Weber Project Engineer XC: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER