Loading...
Freeport NIP(7.0)-CS03050705/06/L:~3 16:17 CITY OF COPPELL ENCY. DEPT. a SRU CTR NO.47~ -,,DEVELOPMENT FEE: WORKSHF'ET / Domestic Meier(s): _ _2 _, 2 inch = [ trriEetion Mete~(s}: Z · 2 inCh = 16 ESU*s ,,/ ~ o : ~.~___Total ~:. 34 5 ESU'a 0 $280.00 aa, ~ ~*'*'--*-~,_~.prlor to issuance of Water Tn9 I-rperfle, Fee: Total ~: 6 Connections 0 $50.00 ea. ~0.00 .... $300.00 (Single fsmily clue I~ior tO issuance of builcling permit) (All other developments due prior to issuance of meter) Dome~lJe Weler Meier Tea.' TOTa~ #: 2 Domestic Meter(s) g $205.28 ~;4~0.56 ~amily due prior to issuance al buJlOing permit) (All other developments due prior to issuance of meter) lrripfion/Firdiae Water Meter Fee: Total '~? 2 I,igatiofl Meter(s) O $205.28 Sd, lO.Si TDtet ~: 0 ~diti~l Irrigation ~terCs) ~ ~0.~, ~.~ Total ~: 2 Fir~ine ~te~s) ~ S3.01D.67 ~.021.3~ ~ue prior to ;ssua~e et w~ meters) Domestic Water Meter ])epasl! Fee: Total#: · 2 Meter(s)~ $30.00 ea. (~ue prior to issuance of water me[ers) s,.~.o0 Irriletlen/Fire Meier Deposit Fee: Total #: .~4 Meters) O $:30.00 es. (] 00% one prior tO issuance of water meters) $120.00 wastewntet Impart Fee: Total Domestic Mete,s Eau's: 16 (Duo prior to issuance of builOing permit) $280.00 ea. $4,480,00 Wlstewatee Tap I~sp~clion Fee: Total #: 2 Connections 0 $50.00 ea. (~'('('('('('('('('~ue Drip; to issuance ~ builditlg permit) ~.DO Uliliry Final Inspection Fcc (Ail ¢kvelopmaeU): Total #: 2 Lots O $50.00 ea. (100% due prior to issuance of building permit) $100.00 Park Fe~ (For Residential Developmems Only): * Preliminary pier approved: Single-lamir¥ {~ $0.00 per lot $0.00 Multi.family, ~ $0.00 per un,t $000 paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEES =ROJECT NAME: Freeport X (ContainerStore) ENGINEER: Pacheco Koch 3RIGINATION DATE: 1/13/2003 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 1/21/2003 $9,660.00 all fees waived* 1/21/2003 $4,480.00 all fees waived Park Fee N/A 1/21/2003 $350,297.03 3/5/2003 1/13/2003 Water Impact Fee Wastewater Impact Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG Permit Bore Permit Overtime Inspection all fees waived $42,512.66 $42,512.66 rb 3/5/2003 $5,593.60 $5,593.60 TT 1/13/2003 $100.00 $100.00 TT 1/13/2003 1/21/2003 Water Tap Inspection $300.00 $300.00 di 5/2 & 5/15 1/21/2003 Wastewater Tap Inspection $100.00 $100.00 di 5/2 & 5/15 1/21/2003 Water Meter (Domestic) $410.56 $410.56 di 5/2 & 5/15 1/21/2003 Water Meter (Fire 10") $3,215.95 $3,010.67 di 5/2/2003 1/21/2003 Water Meter (Fire 8") $2,297.72 $2,092.44 di 5/2/2003 1/21/2003 Meter Deposit (Domestic) $60.00 $60.00 di 5/2 & 5/15 1/21/2003 Meter Deposit (Fire/Irrig) $120.00 $120.00 di 5/2 & 5/15 1/21/2003 Utility Final Inspection $100.00 $100.00 di 5/2 & 5/15 $398,503.29 $48,206.26 $350,297.03 ~Subtotal to En~. Total Fees Fees Paid Amount Owed TOTALS $419,247.52 $54,399.93 $364,847.59 *see development agreement Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. ~ ) The City With A Beautiful Future ~ P.O. Box 478 ~ ~ Coppell, Texas 75019. 214-304-3545 Name OJ~- ~-~ Date ~,' '~ ~'0~l Cash__ Check WATER TAP / METER INSP. FEE SEWER TAP INSP. FEE UTILITY FINAL INSP. FEE SECURI~ DEPOSITS-WA~ WATER TAP FEE S~ER TAP FEE CUSTOMER SERVICE INSPECTION BACKFLOW DEVICE REGIST~TION BACKFLOW DEVICE TESTED REGISTRATION METER TEST FEE 2 3 4 4 TOTAL ReceiveoVBy CITY OF COPPELL NHIPTO City of Coppell Utility Department 816 S. Coppell Rd. Coppell TX 75019 VENDORNO. 3fl~5 VENDOR ACT PIPE & SUPPLY 2011 CALIFORNIA CROSSING DATE 4/15/2003 ...... PURCHASE ORDER F.O.K ORDER NUMBER 03-0002231-100 DALLAS TX 75220 DI~I.~ERYREQ.: 4/11/2003 SUBMIT A! J. INVOICES IN DUPLICATE TO: CITY OF COPPI~I. ACCOUNTS PAYABLE DEPARTMENT P.O. BOX 9478 COPIq~I~. TEXAS 75019 WITH EACH S~NT. I. Anderson pURCHASING AGl~q'r 1. SHIPIVII~Vrs MAY BE P,I~USED IF THE PURCHASE ORDI~, NO. I$ NOT SHOWN ON SHIPPI~S AND BILL OF LADING. 2. EXI~iFr FROM STATE/LOCAL AND FEDI~AL TAXES. 3. SUBSTITUTIONS WILL NOT BE ACCEPI'[~ WITHOUT PRIOR APPROVAL. 4. PARTIAL SHIPMF, N'r$ WILL BE ACCEPTI~ IF INVOICED SEPARATELY. 5. C.O.D. OR COLLECT SHIPMENTS WILL NOT BE ACCEPTED. 6. RECEIVING HOURS ARE 8:00 A.M. TO 3:30 P.M. MONDAY - FRIDAY. QUANTiTY QUANTITY RECEIVED UNIT DESCRIFrlON UNIT COST TOTAL COST 1.0C .0( EA 10" Fireline 0500 series meter 3010.6~ 3010.65 Duke-Freeport X The Container Store 02-03-17-5230 3010.67 NOTICE: MATERIAL SAFEI'¥ DATA ~H~:¥.T MUST l~ ~UMBI'I'flf, I~ FOR ]EACH API~ICABLE ITEM '~ t") 10. g; 9